Contract 98299: 2009-003-00 EXP UC HABITAT PROJECTS - DESIGN & CONSTRUCT
Project Number:
Project Title:
Upper Columbia Habitat Restoration
BPA PM:
Project Stage:
Implementation
Project Area:
Province Subbasin %
Columbia Cascade Entiat 20.00%
Methow 40.00%
Wenatchee 40.00%
Contract Number:
98299
Contract Title:
2009-003-00 EXP UC HABITAT PROJECTS - DESIGN & CONSTRUCT
Contract Continuation:
Previous: Next:
96143: 2009-003-00 EXP UC HABITAT PROJECTS - DESIGN & CONSTRUCT
Contract Status:
Issued
Contract Description:
This contract will fund the Yakama Nation Fisheries Upper Columbia Habitat Restoration Project to seek, design and implement fish habitat restoration projects throughout the Methow, Entiat, and Wenatchee subbasins for the Calendar Year 2026 performance period.  Administrative tasks related to this SOW, such as reporting and inventory management, are provided under BPA Contract CA 97182 (through 5/31/26, then tasks will transfer to the subsequent FY26 release).

This contract details salmon habitat restoration work being designed or implemented in the Upper Columbia Spring Chinook Salmon and Steelhead recovery area under the guidance of the Upper Columbia Spring Chinook Salmon and Steelhead Recovery Plan and the 2021 Habitat Restoration Prioritization.  Yakama Nation Fisheries uses project and ecological concern prioritizations contained within the 2021 Habitat Restoration Prioritization and within Habitat and Geomorphic Reach Assessments reviewed by the Upper Columbia Regional Technical Team to determine which project action types and locations to pursue.  At the project level, Yakama Nation Fisheries subcontracts with technical consultants to develop salmon habitat restoration actions that best address prioritized ecological concerns limiting salmon and steelhead productivity and abundance.  

Work Element actions in 2026 include:

REACH ASSESSMENT PROJECTS (2026/27 HABITAT ASSESSMENTS)

Methow Subbasin:
Goat Creek Reach Assessment

Columbia River:
Whiskey-Dick / Skookumchuck / Quilomene-Brushy Assessments

DESIGN PROJECTS (2026 ENGINEERING AND DESIGN PROJECTS)

Methow Subbasin:
Methow River-Fawn Creek Assessment Unit - Methow Basin EWD Instream Flow Project, Early Winters Creek USFS Project, Big Valley Project
Methow River-Thompson Creek Assessment Unit - W2 Foghorn Reach, 1890s Outlet, and Two Channels Project
Wolf Creek Assessment Unit – Wolf Creek USFS Project
Chewuch River-Doe Creek Assessment Unit- Chewuch River Right Project
Eight Mile Creek Assessment Unit - Eight Mile Barrier Project

Wenatchee Subbasin:
Lower Nason Creek Assessment Unit - Nason Creek N1 DOT Project, Upper Nason Phase 3, Nason RM 9, and Nason Creek Gill Creek/Knifeshop
Lower Chiwawa River Assessment Unit - Lower Chiwawa Big Meadow
Lower White River Assessment Unit - White River CDLT
Wenatchee River-Beaver Creek Assessment Unit - Upper Wenatchee 50 Mile Project
Chiwaukum Creek Assessment Unit - Chiwaukum Creek DOT Project
Middle Icicle Creek Assessment Unit - Icicle Creek USFS Project

Entiat Subbasin:
Entiat River-Lake Creek Assessment Unit – Entiat  Stillwaters Project
Entiat River-Preston Creek - Assessment Unit - Entiat 3D CDLT
Mad River Assessment Unit - Mad River Outlet, MRO Instream Flow Project

RESTORATION ACTIONS (2026 CONSTRUCTION ACTIONS)

Methow Subbasin:
Methow River-Thompson Creek Assessment Unit - W2 Foghorn Reach Phase 1  

Entiat Subbasin:
Nothing Planned in 2026

Wenatchee Subbasin:
Lower Chiwawa River Assessment Unit - Lower Chiwawa USFS Phase 2
Account Type(s):
Expense
Contract Start Date:
01/01/2026
Contract End Date:
12/31/2026
Current Contract Value:
$2,667,068
Expenditures:
$344,228

* Expenditures data includes accruals and are based on data through 28-Feb-2026.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Coop
Accrual category:
Planning & Design
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Shannon Adams Yakama Confederated Tribes No Supervisor adas@yakamafish-nsn.gov (509) 945-0754
Brenda Aguirre Bonneville Power Administration Yes Env. Compliance Lead baguirre@bpa.gov (503) 230-5928
James Albani Yakama Confederated Tribes Yes Technical Contact albj@yakamafish-nsn.gov (651) 341-3211
Victoria Bohlen Bonneville Power Administration Yes COR vlbohlen@bpa.gov (503) 230-3506
Chris Butler Yakama Confederated Tribes Yes Technical Contact butlerc@yakamafish-nsn.gov (509) 449-8215
Annet Dillman Yakama Confederated Tribes Yes Administrative Contact dila@yakamafish-nsn.gov (509) 865-2255
Madeleine Eckmann Yakama Confederated Tribes Yes Technical Contact eckm@yakamafish-nsn.gov (509) 449-2091
Lindsay Henning Yakama Confederated Tribes Yes Technical Contact henl@yakamafish-nsn.gov (509) 860-5351
Tamera Hoptowit Yakama Confederated Tribes Yes Administrative Contact Hopta@yakamafish-nsn.gov (509) 865-5121x6354
Tana Hoptowit Yakama Confederated Tribes Yes Administrative Contact hopt@yakamafish-nsn.gov (509) 865-5121x6318
James Hudson Yakama Confederated Tribes Yes Technical Contact hudj@yakamafish-nsn.gov (509) 907-0538
Jarred Johnson Yakama Confederated Tribes Yes Technical Contact johj@yakamafish-nsn.gov (509) 881-1462
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
JESSICA POWER Bonneville Power Administration Yes CO Assistant jdpower@bpa.gov (503) 230-4023
Brandon Rogers Yakama Confederated Tribes Yes Supervisor rogb@yakamafish-nsn.gov (509) 949-4109
Hans Smith Yakama Confederated Tribes Yes Contract Manager h.smith@methownet.com (509) 449-2750
Elizabeth Witkowski Yakama Confederated Tribes Yes Technical Contact wite@yakamafish-nsn.gov (509) 881-7091
Karen Wolfe Bonneville Power Administration Yes Contracting Officer ktwolfe@bpa.gov (503) 230-3448
Benjamin Woodworth Yakama Confederated Tribes Yes Technical Contact woob@yakamafish-nsn.gov (509) 504-1056


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Effective implementation management and timely contract administration B: 119. Perform project management and administrative duties 12/31/2026
15% Through 30% Designs and Reports for M2 W2 Reach Projects C: 175. M2 W2 Conceptual Designs (Fog Horn 2, Big Valley) 2025-226 12/31/2026
Complete Groundwater Testing D: 208. Foghorn Project Groundwater Testing 2023-219 12/31/2026
30% Through 80% Designs and Reports for M2 LRT Projects E: 175. M2 LRT Designs (1890s, 2 Channels) 2025-233 12/31/2026
Confidential Water Rights Evaluation F: 154. Methow Basin EWD Instream Flow Project - Water Rights Consulting 2015-152 12/31/2026
Permit Level and Final Designs for the Methow Basin EWD Instream Flow Project G: 175. Methow Basin EWD Instream Flow Project - Eng. and Design Phase 3 & 4 - 2015-152 12/31/2026
Complete Groundwater Testing H: 208. Methow Basin EWD Instream Flow Project - Groundwater Testing - 2015-152 12/31/2026
Conceptual Designs and Report for the Early Winters Creek USFS Project Area I: 175. Early Winters Creek USFS Conceptual Designs - 2014-117 12/31/2026
Permit Level and Final Designs and Report for the Wolf Creek USFS Project Area J: 175. Wolf Creek USFS Design Phase 3 & 4 - 2021-213 12/31/2026
Permit Level and Final Designs and Report for the Chewuch River Right Project Area K: 175. Chewuch River Right (WDFW) Phase 2 Design 2011-74 12/31/2026
Updated Review of Designs for the Eight Mile Barrier Removal Project L: 175. Eight Mile Barrier Removal Designs 2015-141 12/31/2026
Field Surveys and Habitat Data Assessment for the Goat Creek Reach Assessment M: 115. Goat Creek Reach Assessment 2025-227 12/31/2026
Chiwawa Areas B and C Permit and Construction Level Designs N: 175. Lower Chiwawa Big Meadow (Areas B and C) Design Phases 3 and 4 - 2021-214 12/31/2026
Complete Groundwater Testing O: 208. Lower Chiwawa Big Meadow (Areas B and C) Groundwater Testing - 2021-214 12/31/2026
Nason Creek N1 DOT Permit and Construction Level Designs P: 175. Nason Creek N1 DOT Design Phase 3 and 4 - 2018-198 12/31/2026
30% Through 80% Designs and Reports for the Upper Nason Phase 3 Project Q: 175. Upper Nason Creek Side Channel Redesign Phases 3 2020-207 12/31/2026
15% Through 30% Designs and Reports for Lower Nason Creek Reach Projects R: 175. Nason Creek Conceptual Designs (RM 9, Gill Crk, Knifeshop) 2025-228 12/31/2026
Fifty-Mile Permit and Construction Level Designs S: 175. Upper Wenatchee 50 Mile Designs 2025-229 12/31/2026
Conceptual Designs and Report for the Chiwaukum DOT Area T: 175. Chiwaukum Creek DOT Designs 2025-230 12/31/2026
Conceptual Designs Report for the White River Conceptual Design (CDLT) Project U: 175. White River CDLT Conceptual Design - 2024-224 12/31/2026
Conceptual Designs Report for the Icicle Creek USFS Project V: 175. Icicle Creek USFS Designs 2025-231 12/31/2026
Draft Construction Plan for the Entiat 3D CDLT Project Area W: 175. Entiat 3D CDLT Design Phase 3 - 2019-210 12/31/2026
Complete Groundwater Testing X: 208. Entiat 3D CDLT Design Phase 3 Groundwater Testing - 2024-225 12/31/2026
Conceptual Designs Report for the Entiat Stillwater Project Y: 175. Entiat Stillwaters Design Phase 2 - 2019-210 12/31/2026
Permit and Construction Level Designs for the Mad River Outlet Project Area Z: 175. Mad River Outlet Design Phases 3 & 4 - 2021-215 12/31/2026
Confidential Water Rights Evaluation AA: 154. Entiat Basin MRO Instream Flow Project - Water Rights Consulting 2022-217 12/31/2026
Alternative Water Delivery Feasibility Assessment AB: 175. Entiat Basin MRO Instream Flow Project - Eng. Feasibility Assessment 2022-217 12/31/2026
Complete Groundwater Testing AC: 208. Entiat Basin MRO Instream Flow Project Groundwater Testing 2022-217 12/31/2026
Field Surveys and Habitat Data Assessment for the Whiskey-Dick / Skookumchuck Quilomene-Brushy Reach Assessment AD: 115. Whiskey-Dick / Skookumchuck / Quilomene-Brushy Reach Assessments 2025-232 12/31/2026
Construction Management Complete AE: 100. W2 Foghorn Reach Phase 1 Construction Oversight - 2023-219 12/31/2026
Large Wood Habitat added into 0.5 miles of the Methow River AF: 29. W2 Foghorn Reach Phase 1 Construction - 2023-219 12/31/2026
Construction Management Complete AG: 100. Lower Chiwawa USFS (Area G) Phase 2 Oversight 2021-214 12/31/2026
Side Channel Restoration and Large Wood Habitat added into 0.7 miles of the Chiwawa River AH: 30. Lower Chiwawa USFS (Area G) Phase 2 Construction 2021-214 12/31/2026

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 18 instances of WE 175 Produce Design
  • 2 instances of WE 154 Develop and Negotiate Water Right Transaction
  • 2 instances of WE 100 Construction Management
  • 5 instances of WE 208 Irrigation Infrastructure Construction or Replacement
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 175 Produce Design
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 2 instances of WE 115 Produce Inventory or Assessment
  • 18 instances of WE 175 Produce Design
  • 2 instances of WE 154 Develop and Negotiate Water Right Transaction
  • 2 instances of WE 100 Construction Management
  • 5 instances of WE 208 Irrigation Infrastructure Construction or Replacement
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 119 Perform project management and administrative duties
C 175 M2 W2 Conceptual Designs (Fog Horn 2, Big Valley) 2025-226
D 208 Foghorn Project Groundwater Testing 2023-219
E 175 M2 LRT Designs (1890s, 2 Channels) 2025-233
F 154 Methow Basin EWD Instream Flow Project - Water Rights Consulting 2015-152
G 175 Methow Basin EWD Instream Flow Project - Eng. and Design Phase 3 & 4 - 2015-152
H 208 Methow Basin EWD Instream Flow Project - Groundwater Testing - 2015-152
I 175 Early Winters Creek USFS Conceptual Designs - 2014-117
J 175 Wolf Creek USFS Design Phase 3 & 4 - 2021-213
K 175 Chewuch River Right (WDFW) Phase 2 Design 2011-74
L 175 Eight Mile Barrier Removal Designs 2015-141
M 115 Goat Creek Reach Assessment 2025-227
N 175 Lower Chiwawa Big Meadow (Areas B and C) Design Phases 3 and 4 - 2021-214
O 208 Lower Chiwawa Big Meadow (Areas B and C) Groundwater Testing - 2021-214
P 175 Nason Creek N1 DOT Design Phase 3 and 4 - 2018-198
Q 175 Upper Nason Creek Side Channel Redesign Phases 3 2020-207
R 175 Nason Creek Conceptual Designs (RM 9, Gill Crk, Knifeshop) 2025-228
S 175 Upper Wenatchee 50 Mile Designs 2025-229
T 175 Chiwaukum Creek DOT Designs 2025-230
U 175 White River CDLT Conceptual Design - 2024-224
V 175 Icicle Creek USFS Designs 2025-231
W 175 Entiat 3D CDLT Design Phase 3 - 2019-210
X 208 Entiat 3D CDLT Design Phase 3 Groundwater Testing - 2024-225
Y 175 Entiat Stillwaters Design Phase 2 - 2019-210
Z 175 Mad River Outlet Design Phases 3 & 4 - 2021-215
AA 154 Entiat Basin MRO Instream Flow Project - Water Rights Consulting 2022-217
AB 175 Entiat Basin MRO Instream Flow Project - Eng. Feasibility Assessment 2022-217
AC 208 Entiat Basin MRO Instream Flow Project Groundwater Testing 2022-217
AD 115 Whiskey-Dick / Skookumchuck / Quilomene-Brushy Reach Assessments 2025-232
AE 100 W2 Foghorn Reach Phase 1 Construction Oversight - 2023-219
AF 29 W2 Foghorn Reach Phase 1 Construction - 2023-219
AG 100 Lower Chiwawa USFS (Area G) Phase 2 Oversight 2021-214
AH 30 Lower Chiwawa USFS (Area G) Phase 2 Construction 2021-214