Contract 97150: 2010-001-00 EXP CCNRD NASON CREEK UPPER WHITE PINE DESIGN
Project Number:
Title:
Upper Columbia Programmatic Habitat
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Entiat 25.00%
Methow 25.00%
Okanogan 25.00%
Wenatchee 25.00%
Contract Number:
97150
Contract Title:
2010-001-00 EXP CCNRD NASON CREEK UPPER WHITE PINE DESIGN
Contract Continuation:
Previous: Next:
n/a
Contract Status:
Issued
Contract Description:
This contract is for Phase 1 of the Upper White Pine (UWP), Segment II Habitat Improvement Project.

This phase will develop draft conceptual designs (15% designs) for restoration treatments that address unacceptable limiting factors within the UWP Segment II project reach (Nason Creek RM 13.0 - 13.6). It will include background research and data collection, topographic and geomorphic survey, hydraulic modeling, and targeted outreach and collaboration. The process will develop and evaluate several restoration alternatives, identify a preferred alternative, and prepare Conceptual Designs that describe treatments to improve capacity and survival for multiple high and medium priority ESA-listed salmonid life stages.

The project area is within Lower Nason Creek, Reach 13, a rank 1 priority reach and a high priority for multiple life stages of ESA-listed salmonids including: spawning, adult holding and rearing spring Chinook and bull trout (high priority); spawning (medium priority) and winter rearing (high priority) steelhead; and adult non-spawning and sub adult rearing bull trout (medium priority). Implementation of the proposed reach-based design effort is expected to result in up to 0.2 river miles (RMs) of levee removal, channel complexity restoration on up to 0.6 RMs, potential channel modification on 0.4 RMs, and enhanced connection of ~7 acres of floodplain within the project reach. This project expands upon the UWP Phase I restoration effort (RM 12.7-13.2) completed in 2018 (see uploaded UWP Final Report), which realigned 0.3 RMs (RM 12.7-13.0) of the channelized UWP reach into engineered, high complexity meanders, the channel still remains in the constructed and entrenched alignment from RM 13.0-13.4.

This project was selected for funding in the FY25 Targeted Solicitation under Bonneville's Upper Columbia Habitat Programmatic (project #2010-001-00). This contract contains subcontracts.
Account Type(s):
Expense
Contract Start Date:
06/01/2025
Contract End Date:
05/31/2026
Current Contract Value:
$157,372
Expenditures:
$89,341

* Expenditures data includes accruals and are based on data through 31-Jan-2026.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Coop
Accrual category:
Planning & Design
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Scott Bailey Chelan County Yes Contract Manager scott.bailey@co.chelan.wa.us (509) 679-2131
Christina Barrineau Chelan County Yes Technical Contact christina.barrineau@co.chelan.wa.us (509) 670-6988
Sofia Bjorklund Chelan County Yes Administrative Contact sofia.bjorklund@co.chelan.wa.us (509) 667-6324
Victoria Bohlen Bonneville Power Administration Yes COR vlbohlen@bpa.gov (503) 230-3506
Meghan Camp Upper Columbia Salmon Recovery Board No Interested Party meghan.camp@ucsrb.org (509) 630-8226
Jay Chong Bonneville Power Administration Yes Contracting Officer jxchong@bpa.gov (503) 230-4007
Edward Gresh Bonneville Power Administration No Env. Compliance Lead esgresh@bpa.gov (503) 230-5756
Mike Kane Chelan County Yes Technical Contact mike.kane@co.chelan.wa.us (509) 667-6467
Mike Kaputa Chelan County Yes Supervisor mike.kaputa@co.chelan.wa.us (509) 667-6584
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
JESSICA POWER Bonneville Power Administration Yes CO Assistant jdpower@bpa.gov (503) 230-4023


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Effective implementation management and timely contract administration B: 119. Project Management and Administration 05/31/2026
EC Deliverables C: 165. Environmental Compliance 05/31/2026
Coordination Summary Memo D: 191. Watershed Coordination 05/31/2026
Deliverable: Wetland Determination Memo E: 115. Existing Conditions Assessment 05/15/2026
Conceptual design (15%) F: 175. Produce 15% Concept Plans 05/31/2026
Completed Progress (Annual) Report G: 132. Progress Report to UCSRB 01/15/2026

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 1 instance of WE 175 Produce Design
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 1 instance of WE 175 Produce Design
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 1 instance of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 119 Project Management and Administration
C 165 Environmental Compliance
D 191 Watershed Coordination
E 115 Existing Conditions Assessment
F 175 Produce 15% Concept Plans
G 132 Progress Report to UCSRB