| 94864: 2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION |
* Expenditures data includes accruals and are based on data through 31-Oct-2025.
| Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
|---|---|---|---|---|
| Effective implementation management and timely contract administration | A: 119. Manage and Administer Project | 06/30/2026 | ||
| Complete EC Requirements | B: 165. Environmental Compliance | 06/30/2026 | ||
| Construction Management Complete | C: 100. Manage Construction of Pond Series 4 Habitat and Flow Elements and Adaptive Management of Portions of the West Fork Confluence Project | 05/31/2026 | ||
| Completed Channel Construction | D: 30. Modify Channels to Ensure Perennial Flow through Pond Series 4 | 06/01/2026 | ||
| Completed aquatic and floodplain complexity work | E: 29. Increase channel and floodplain complexity through Pond Series 4 (PS4) | 06/30/2026 | ||
| Culvert installation complete | F: 184. Replace undersized culvert near inlet to Pond Series 4 | 06/30/2026 | ||
| Lower meander bend and side channel successfully restored. | G: 186. Repair/adaptively manage lower meander bend on Yankee Fork | 06/30/2026 | ||
| Upper meander bend and side channel successfully restored. | H: 186. Repair/adaptively manage upper meander bend on Yankee Fork | 06/30/2026 | ||
| Complete 80% design | I: 175. Design Jerrys Creek or Silver Creek Reconnect Project. | 06/30/2026 | ||
| Completed Progress (Annual) Report | K: 132. Submit Final Progress Report for the Period 1 July 2025 to 30 June 2026 | 06/30/2026 |
| Primary Focal Species | Work Statement Elements |
|---|---|
| Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened) |
|
| Steelhead (O. mykiss) - Snake River DPS (Threatened) |
|
| Trout, Bull (S. confluentus) (Threatened) |
|
| Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
|---|---|---|---|---|---|---|---|---|---|
| A | 119 | Manage and Administer Project | |||||||
| B | 165 | Environmental Compliance | |||||||
| C | 100 | Manage Construction of Pond Series 4 Habitat and Flow Elements and Adaptive Management of Portions of the West Fork Confluence Project | |||||||
| D | 30 | Modify Channels to Ensure Perennial Flow through Pond Series 4 | 07/09/2025 | ||||||
| E | 29 | Increase channel and floodplain complexity through Pond Series 4 (PS4) | 07/09/2025 | ||||||
| F | 184 | Replace undersized culvert near inlet to Pond Series 4 | 07/09/2025 | ||||||
| G | 186 | Repair/adaptively manage lower meander bend on Yankee Fork | 07/09/2025 | ||||||
| H | 186 | Repair/adaptively manage upper meander bend on Yankee Fork | 07/09/2025 | ||||||
| I | 175 | Design Jerrys Creek or Silver Creek Reconnect Project. | 04/01/2025 | ||||||
| J | 185 | Periodic Status Reports for BPA | |||||||
| K | 132 | Submit Final Progress Report for the Period 1 July 2025 to 30 June 2026 |