Contract 84051 REL 63: 2018-002-00 EXP CCT INTEGRATED IN-STREAM PIT TAG DETECTION O&M
Project Number:
Project Title:
Integrated In-stream PIT tag Detection System Operations and Maintenance
BPA PM:
Project Stage:
Implementation
Project Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
84051 REL 63
Contract Title:
2018-002-00 EXP CCT INTEGRATED IN-STREAM PIT TAG DETECTION O&M
Contract Continuation:
Previous: Next:
84051 REL 41: 2018-002-00 EXP CCT OKANAGAN IN-STREAM PIT TAG DETECTION O&M
Contract Status:
Issued
Contract Description:
About this contract:
Through BPA project #2018-002-00, this contract provides funding for operations and maintenance of PIT array infrastructure within the Okanogan subbasin to complete coverage of the entire Upper Columbia ESU for summer steelhead. This PIT array system is used for a multitude of monitoring and evaluation efforts. Ongoing operations and maintenance of the arrays within the Okanogan subbasin is provided by the Colville Tribes.

WDFW, under this project #2018-002-00 is responsible for all reporting and permitting of PIT-tag activities in the Upper Columbia ESU/DPS. steelhead. This contract also supports installation of new PIT array infrastructure within the Okanogan River Basin as needed. Currently no new installations are planned but we do plan to begin a dialogue with BPA about future PIT-tag array needs.

Project background:
Project 2018-002-00 is part of a standardized PIT-tag operation and maintenance effort in the Columbia River basin funded by Bonneville Power Administration (BPA). Data are uploaded to the PTAGIS database and thus readily accessible for use in many analyses, evaluations, assessments and reporting needs conducted by many different agencies and groups.  Existing M & E activities combined with recent advances in PIT tag technology provide an opportunity to improve the quality of the data generated to make management decisions concerning ESA listed species.

The overall objectives of the project are to:
Operate and maintain PIT-tag arrays sufficient to evaluate adult returns to, and outmigrant's from, each sub-watershed (HUC-12 scale).
In the Okanogan River Basin, two types of PIT-tag arrays are used:
1) permanent arrays are used to enumerate both adult returns and juvenile out-migrants on perennial streams and the mainstem river, and
2) temporary interrogation sites are installed, operated, and removed on a seasonal basis to document distribution extents of adult steelhead, fish passage at barriers or impediments, and to enumerate adult returns and juvenile outmigration in intermittent watersheds.

Over the last 20 years the Okanogan River PIT-tag array infrastructure has expanded using multiple revenue streams from only one intermittent PIT tag array in 2010 on Omak Creek to a HUC-12 scale basin-wide network of PIT tag interrogation systems throughout the  Basin today.


Account Type(s):
Expense
Contract Start Date:
07/01/2026
Contract End Date:
06/30/2027
Current Contract Value:
$160,170
Expenditures:

* Expenditures data includes accruals and are based on data through 31-Mar-2026.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Coop
Accrual category:
RM&E
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Complete all environmental compliance work listed under this work element B: 165. Environmental compliance documents 06/30/2027
Effective implementation management and timely contract administration C: 119. Manage and administer project 06/30/2027
Deliverable D: 159. Upload PIT tag data to PTAGIS database 06/30/2027
Produce accessible, error-checked datasets E: 157. Construct, install, maintain, and remove temporary (seasonal) PIT tag arrays in preselected locations 06/30/2027
Produce accessible, error-checked datasets F: 157. Operate, maintain, and update permanent in-stream PIT tag arrays 06/30/2027
Completed Progress (Annual) Report G: 132. Submit Progress Report - Will be submitted under WDFW 06/30/2027

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
Sockeye (O. nerka) - Okanogan River ESU
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 165 Environmental compliance documents
C 119 Manage and administer project
D 159 Upload PIT tag data to PTAGIS database
E 157 Construct, install, maintain, and remove temporary (seasonal) PIT tag arrays in preselected locations 01/23/2026
F 157 Operate, maintain, and update permanent in-stream PIT tag arrays 01/23/2026
G 132 Submit Progress Report - Will be submitted under WDFW