Views/Actions
Columbia Basin Fish and Wildlife Program
RSS Feed for updates to Project 2002-021-00 - Reduce Teanaway Water Temps Follow this via RSS feed. Help setting up RSS feeds?

Project Summary

Project 2002-021-00 - Reduce Teanaway Water Temps
Project Number:
2002-021-00
Title:
Reduce Teanaway Water Temps
Summary:
None
Proposer:
None
Proponent Orgs:
Washington Department of Ecology (Govt - State)
Starting FY:
2002
Ending FY:
2004
Stage:
Area:
Province Subbasin %
Columbia Plateau Yakima 100.00%
Purpose:
Habitat
Emphasis:
Restoration/Protection
Focal Species:
Species Benefit:
Anadromous: 100.0%   Resident: 0.0%   Wildlife: 0.0%
Tags:
None
Special:
None
BiOp Association:
None

Priority work areas in the Teanaway Basin overlaid on the FLIR data collected by the USFS.

Figure Name: Figure 1

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 10

Project: 2002-021-00

Contract: 9803

Irrigation Efficiency projects along the Teanaway

Figure Name: Figure 2

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 11

Project: 2002-021-00

Contract: 9803

Tree planting sites along the mainstem of the Teanaway River.

Figure Name: Figure 3

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 12

Project: 2002-021-00

Contract: 9803

Tree planting sites along the mainstem of the Teanaway River.

Figure Name: Figure 4

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 12

Project: 2002-021-00

Contract: 9803

Benchmark photos of the plantings at Conner property (left) and Nichols property (right) along the mainstem Teanaway River.

Figure Name: Figure 5

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 12

Project: 2002-021-00

Contract: 9803

Benchmark photos of the plantings at Conner property (left) and Nichols property (right) along the mainstem Teanaway River.

Figure Name: Figure 6

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 12

Project: 2002-021-00

Contract: 9803

Water quality monitoring locations.

Figure Name: Figure 7

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 14

Project: 2002-021-00

Contract: 9803

The mainstem Teanaway River at the Lambert Road bridge on the following dates (clockwise from upper left) December 30, 2002, March 14, 2003, August 26, 2003, and October 22, 2003.

Figure Name: Figure 8a

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 15

Project: 2002-021-00

Contract: 9803

The mainstem Teanaway River at the Lambert Road bridge on the following dates (clockwise from upper left) December 30, 2002, March 14, 2003, August 26, 2003, and October 22, 2003.

Figure Name: Figure 8b

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 15

Project: 2002-021-00

Contract: 9803

The mainstem Teanaway River at the Lambert Road bridge on the following dates (clockwise from upper left) December 30, 2002, March 14, 2003, August 26, 2003, and October 22, 2003.

Figure Name: Figure 8c

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 15

Project: 2002-021-00

Contract: 9803

The mainstem Teanaway River at the Lambert Road bridge on the following dates (clockwise from upper left) December 30, 2002, March 14, 2003, August 26, 2003, and October 22, 2003.

Figure Name: Figure 8d

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 15

Project: 2002-021-00

Contract: 9803

The mainstem Teanaway River at the Red Bridge Road bridge on the following dates (clockwise from upper left) December 30, 2002, March 14, 2003, August 26, 2003, and October 22, 2003.

Figure Name: Figure 9a

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 15

Project: 2002-021-00

Contract: 9803

The mainstem Teanaway River at the Red Bridge Road bridge on the following dates (clockwise from upper left) December 30, 2002, March 14, 2003, August 26, 2003, and October 22, 2003.

Figure Name: Figure 9b

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 15

Project: 2002-021-00

Contract: 9803

(L to R) North Fork, Middle Fork and West Fork on August 26th. Eighty nine percent of the flow into the mainstem was contributed by the North Fork.

Figure Name: Figure 11a

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 17

Project: 2002-021-00

Contract: 9803

(L to R) North Fork, Middle Fork and West Fork on August 26th. Eighty nine percent of the flow into the mainstem was contributed by the North Fork.

Figure Name: Figure 11b

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 17

Project: 2002-021-00

Contract: 9803

(L to R) North Fork, Middle Fork and West Fork on August 26th. Eighty nine percent of the flow into the mainstem was contributed by the North Fork.

Figure Name: Figure 11c

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 17

Project: 2002-021-00

Contract: 9803

The mainstem Teanaway River at the Red Bridge Road bridge on the following dates (clockwise from upper left) December 30, 2002, March 14, 2003, August 26, 2003, and October 22, 2003.

Figure Name: Figure 9c

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 15

Project: 2002-021-00

Contract: 9803

The mainstem Teanaway River at the Red Bridge Road bridge on the following dates (clockwise from upper left) December 30, 2002, March 14, 2003, August 26, 2003, and October 22, 2003.

Figure Name: Figure 9d

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 15

Project: 2002-021-00

Contract: 9803

Lick Creek carried a significant sediment load, especially during storm events (left). Sediment depositions are obvious when the water is clearer.

Figure Name: Figure 15a

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 20

Project: 2002-021-00

Contract: 9803

Lick Creek carried a significant sediment load, especially during storm events (left). Sediment depositions are obvious when the water is clearer.

Figure Name: Figure 15b

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 20

Project: 2002-021-00

Contract: 9803

Teanaway Basin, in Kittitas County, Washington

Figure Name: Appendix A-Figure 1

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 33

Project: 2002-021-00

Contract: 9803

Teanaway Basin Land Use Map. Derived from DNR data layer.

Figure Name: Appendix A-Figure 2

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 35

Project: 2002-021-00

Contract: 9803

Location of sampling sites in Kittitas County

Figure Name: Appendix A-Figure 3

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 40

Project: 2002-021-00

Contract: 9803

No caption provided.

Figure Name: Appendix I-Photo 1

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 73

Project: 2002-021-00

Contract: 9803

No caption provided.

Figure Name: Appendix I-Photo 2

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 73

Project: 2002-021-00

Contract: 9803

No caption provided.

Figure Name: Appendix I-Photo 3

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 74

Project: 2002-021-00

Contract: 9803

No caption provided.

Figure Name: Appendix I-Photo 4

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 74

Project: 2002-021-00

Contract: 9803

No caption provided.

Figure Name: Appendix I-Photo 5

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 74

Project: 2002-021-00

Contract: 9803

No caption provided.

Figure Name: Appendix I-Photo 6

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 75

Project: 2002-021-00

Contract: 9803

No caption provided.

Figure Name: Appendix I-Photo 7

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 75

Project: 2002-021-00

Contract: 9803

No caption provided.

Figure Name: Appendix I-Photo 8

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 75

Project: 2002-021-00

Contract: 9803

No caption provided.

Figure Name: Appendix I-Photo 9

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 76

Project: 2002-021-00

Contract: 9803

No caption provided.

Figure Name: Appendix I-Photo 10

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 76

Project: 2002-021-00

Contract: 9803

No caption provided.

Figure Name: Appendix I-Photo 11

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 77

Project: 2002-021-00

Contract: 9803

No caption provided.

Figure Name: Appendix I-Photo 12

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 77

Project: 2002-021-00

Contract: 9803

No caption provided.

Figure Name: Appendix I-Photo 13

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 77

Project: 2002-021-00

Contract: 9803

No caption provided.

Figure Name: Appendix I-Photo 14

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 78

Project: 2002-021-00

Contract: 9803

No caption provided.

Figure Name: Appendix I-Photo 15

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 78

Project: 2002-021-00

Contract: 9803

No caption provided.

Figure Name: Appendix I-Photo 16

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 78

Project: 2002-021-00

Contract: 9803

No caption provided.

Figure Name: Appendix I-Photo 17

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 79

Project: 2002-021-00

Contract: 9803

No caption provided.

Figure Name: Appendix I-Photo 18

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 79

Project: 2002-021-00

Contract: 9803

No caption provided.

Figure Name: Appendix I-Photo 19

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 80

Project: 2002-021-00

Contract: 9803

No caption provided.

Figure Name: Appendix I-Photo 20

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 80

Project: 2002-021-00

Contract: 9803

No caption provided.

Figure Name: Appendix I-Photo 21

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 80

Project: 2002-021-00

Contract: 9803

No caption provided.

Figure Name: Appendix I-Photo 22

Document ID: 00009803-1

Document: Reduce Water Temperatures in the Teanaway Project

Page Number: 80

Project: 2002-021-00

Contract: 9803


Summary of Budgets

To view all expenditures for all fiscal years, click "Project Exp. by FY"

Expense SOY Budget Working Budget Contracted Amount Modified Contract Amount Expenditures *
FY2016 (Previous) $0 $0 $0 $0

FY2017 (Current) $0 $0 $0 $0

FY2018 (Next) $0 $0 $0 $0

* Expenditures data includes accruals and are based on data through 31-Jul-2017

No Decided Budget Transfers

Pending Budget Decision?  No


No Project Cost Share

Fiscal Year Cost Share Partner Total Proposed
Contribution
Total Confirmed
Contribution

Contracts

The table below contains contracts with the following statuses: Active, Complete, History, Issued.
Expense Contracts:
Number Contractor Name Title Status Contracted Amount Dates
9803 SOW Washington Department of Ecology 2002-021-00 REDUCE WATER TEMPERATURES IN TEANAWAY History $183,700 5/20/2002 - 6/30/2004



Annual Progress Reports
Expected (since FY2004):0
Completed:0
On time:0
Status Reports
Completed:0
On time:0
Avg Days Late:None



No assessments are available for this project.
Project Relationships: None

Name Role Organization
John Piccininni (Inactive) Project Manager Bonneville Power Administration