Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 25690: 1992-061-00 IMPLEMENTATION COEUR D' ALENE TRIBE ALBENI FALLS
Project Number:
Title:
Albeni Falls Wildlife Mitigation Capital Land Acquisitions
Stage:
Implementation
Area:
Province Subbasin %
Intermountain Pend Oreille 100.00%
Contract Number:
25690
Contract Title:
1992-061-00 IMPLEMENTATION COEUR D' ALENE TRIBE ALBENI FALLS
Contract Continuation:
Previous: Next:
19924: PI 1992-061-00 -- ALBENI FALLS WILDLIFE MITIGATION
  • 30061: 1992-061-00 PRE IMPLEMENTATION COEUR D'ALENE TRIBE ALBENI FALLS
Contract Status:
History
Contract Description:
Account Type(s):
Expense
Contract Start Date:
10/01/2005
Contract End Date:
09/30/2006
Current Contract Value:
$260,283
Expenditures:
$260,283

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Contract Contractor:
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Cameron Heusser Coeur D'Alene Tribe Yes Supervisor cheusser@cdatribe-nsn.gov (208) 686-5521
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Anders Mikkelsen Coeur D'Alene Tribe Yes Contract Manager amikkelsen@cdatribe-nsn.gov (208) 686-8902
Shannon Stewart Bonneville Power Administration Yes Env. Compliance Lead scstewart@bpa.gov (503) 230-5928
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Virgil Watts III Bonneville Power Administration Yes COR vlwatts@bpa.gov (503) 230-4625


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Albeni Falls Project Management A: 119. Albeni Falls Wildlife Mitigation Program 09/29/2006 09/29/2006
Herbicide Matrix B: 165. Produce Noxious Weed Control Chemical Matrix for approval 04/28/2006 01/03/2006
Regional Wildlife Habitat Coordination & Administration C: 118. Coordinate with the AFWG, UCUT, BPA, NPPC and CBFWA Members 09/29/2006 09/29/2006
Bird Survey data collection and input D: 157. Collect and Generate Field and Lab data for Bird Sampling 09/29/2006 09/29/2006
Amphibian Larval Trapping Data E: 157. Collect and Generate Field and Lab data for Amphibian Sampling 09/29/2006 09/29/2006
Vegetation Sampling data collection and input F: 157. Collect and Generate Field and Lab data for Vegetation Sampling 09/29/2006 09/29/2006
Small Mammal Trapping data collection and input G: 157. Collect and Generate Field and Lab data for Mammal Sampling 09/29/2006 09/29/2006
Provide Summary Data Reports H: 161. Disseminate Raw and Summary data to the Region (AFWG) 09/29/2006
Analyze and Interpret RM&E Data I: 162. Analyze data for subsequent mitigation management 09/29/2006 09/29/2006
Develop Centralized Database J: 159. Submit and Aquire Data for the Albeni Falls Program to a Regional Database 09/29/2006 09/29/2006
Regional Wildlife Technical Review K: 122. Albeni Falls Workgroup Management Plan and Acqusition Review 09/29/2006 09/29/2006
Complete HEP Reports L: 87. Prepare HEP report for the Albeni Falls Mitigation Projects 09/28/2006
Hydrological Assessment of Goosehaven Lake M: 115. Sub-Contract Hydrological Assessment 06/14/2006
Management Plan Development N: 174. Produce management plans and M&E plans for the Benewah Creek and Goose Haven lake 09/29/2006 09/29/2006
Maintain Properties O: 18. EXPIRED: Maintain Fenceline and Structures 09/29/2006 09/29/2006
Fence Installation on Goose Haven and Benewah Creek P: 40. Construct 2.5 miles of fence at Goosehaven Lake 09/29/2006 09/29/2006
Fence Installation on Goose Haven and Benewah Creek Q: 40. Construct 2.5 miles of fence at Benewah Creek 09/29/2006 09/29/2006
Herbicide Application on Benewah Creek Property R: 22. Maintain Trees and Wetland vegetation planted along the Benewah Creek property 09/29/2006 09/29/2006
Noxious Weed Control S: 53. Remove noxious weeds via chemical means on the Goosehaven and Benewah properties 09/29/2006 09/29/2006
Wetland Re-Creation T: 53. Re-create wetland areas 09/29/2006
Begin Wetland Creation U: 181. Pump canal water and install culvert water control structure 09/29/2006
Controlled Burn on Goosehaven lake V: 31. Goose Haven Burn Site 09/29/2006
Debris Removal on Habitat Properties W: 27. Remove debris from Goosehaven lake and Benewah Creek 09/29/2006 09/29/2006
Deterence to Tresspass X: 26. Investigate trespass on Benewah and Goosehaven properties 09/29/2006 09/29/2006
M&E Database Development Y: 160. Implement M&E Database for AFWM projects 09/29/2006
Albeni Falls Workgroup Annual Report Z: 132. Produce Albeni Falls Workgroup Annual Report 05/31/2006 03/22/2006

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Wildlife
  • 1 instance of WE 22 Maintain Vegetation
  • 1 instance of WE 26 Investigate Trespass
  • 1 instance of WE 27 Remove Debris
  • 2 instances of WE 40 Install Fence
  • 1 instance of WE 53 Remove Vegetation
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 1 instance of WE 174 Produce Plan
  • 4 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Albeni Falls Wildlife Mitigation Program
B 165 Produce Noxious Weed Control Chemical Matrix for approval
C 118 Coordinate with the AFWG, UCUT, BPA, NPPC and CBFWA Members
D 157 Collect and Generate Field and Lab data for Bird Sampling
E 157 Collect and Generate Field and Lab data for Amphibian Sampling
F 157 Collect and Generate Field and Lab data for Vegetation Sampling
G 157 Collect and Generate Field and Lab data for Mammal Sampling
H 161 Disseminate Raw and Summary data to the Region (AFWG)
I 162 Analyze data for subsequent mitigation management
J 159 Submit and Aquire Data for the Albeni Falls Program to a Regional Database
K 122 Albeni Falls Workgroup Management Plan and Acqusition Review
L 87 Prepare HEP report for the Albeni Falls Mitigation Projects
M 115 Sub-Contract Hydrological Assessment
N 174 Produce management plans and M&E plans for the Benewah Creek and Goose Haven lake
O 18 EXPIRED: Maintain Fenceline and Structures
P 40 Construct 2.5 miles of fence at Goosehaven Lake
Q 40 Construct 2.5 miles of fence at Benewah Creek
R 22 Maintain Trees and Wetland vegetation planted along the Benewah Creek property
S 53 Remove noxious weeds via chemical means on the Goosehaven and Benewah properties
T 53 Re-create wetland areas
U 181 Pump canal water and install culvert water control structure
V 31 Goose Haven Burn Site
W 27 Remove debris from Goosehaven lake and Benewah Creek
X 26 Investigate trespass on Benewah and Goosehaven properties
Y 160 Implement M&E Database for AFWM projects
Z 132 Produce Albeni Falls Workgroup Annual Report
AA 185 Enter PISCES status Reporting