Contract 27859: 2001 032 00 HANGMAN CREEK FISHERIES ENHANCEMENT
Project Number:
Title:
Coeur D'Alene Fisheries Enhancement-Hangman Creek
Stage:
Implementation
Area:
Province Subbasin %
Intermountain Spokane 100.00%
Contract Number:
27859
Contract Title:
2001 032 00 HANGMAN CREEK FISHERIES ENHANCEMENT
Contract Continuation:
Previous: Next:
22363: 2001-032-00 HANGMAN CREEK FISHERIES ENHANCEMENT
  • 33220: 2001-032-00 EXP HANGMAN CREEK FISHERIES ENHANCEMENT
Contract Status:
History
Contract Description:
The Scope of Work and budget presented in this document represent the activities associated with the Coeur 'd Alene Tribe's resident fish enhancement project on Hangman Creek within the Spokane Sub-basin corresponding to the contract period May 1, 2006 to April 30, 2007.  The objectives, tasks, deliverables and budget format found in previous submittals for this project have been converted to reflect the work element, milestone and budgeting format  consistent with BPA's new Process Improvement Initiative (Pisces).

Project 2001-032-00 has entered the Implementation Phase of the Project after a 3-year Assessement. Restoration Activities will be highlighted by a project of LWD placement in Indian Creek to inprove habitat complexity.  Other activities will center on the goal of restoring riparian vegetation to priority areas in order to link up isolated populations of Redband trout (Onchorhynchus mykiss gairdneri). This project will be working with it's sister project (2001-033-00) administered by the Coeur d 'Alene Tribe's Wildlife Program to restore Hangman Creek's streams and wetlands.  Total amount of this budget request is $303,874

The Work Elements fall under 4 general Objectives

      Objective 1 - Planning and Coordination
WE A: Outreach and Education
WE B: Coordinate Restoration Efforts with Stakeholders
WE C: Identify and Select New Restoration Projects
WE D: Produce Design and/or Specifications, Collect Preliminary Design Data for New Projects
WE E: NEPA Analysis and Documentation
WE F: Tribal and Regional Coordination

      Objective 2: Implementation
WE G:  Place Instream LWD in Indian Creek
WE H: Plant Vegetation at Indian Creek
WE I: Maintain Vegetation at Indian Creek
WE J:  Enhance Floodplain Plant Communities at Hangman Sweatlodge area.
WE K: Maintain Plants at Hangman Sweatlodge area

      Objective 3: Research and Monitoring
WE L: Collect Physical Habitat Data
WE M: Collect Water Quality Data
WE N: Transfer Data from Field Equipment
WE O: Maintain Water Quality and Physical Habitat Database
WE P: Analyze Water Quality and Physical Habitat
WE Q: Install and Maintain Traps
WE R: Sample Fish using Migration Traps
WE S: Sample Fish using Electroshocking Equipment
WE T: Maintain Fisheries Database
WE U: Summarize Water Quality, Physical Habitat, and Fisheries using GIS
WE V: Analyze Data Generated from Salmonid Sampling in Target Watersheds

      Objective 4: Administration
WE X: Manage and Administer Project
WE Y: Produce Quarterly Reports via Pisces
WE Z: Produce Annual Reports
Account Type(s):
Expense
Contract Start Date:
05/01/2006
Contract End Date:
04/30/2007
Current Contract Value:
$289,923
Expenditures:
$289,923

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Contract Contractor:
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Terry Holtcamp Jr Bonneville Power Administration Yes Contracting Officer taholtcamp@bpa.gov (503) 230-3518
Bruce Kinkead Coeur D'Alene Tribe Yes Technical Contact bkinkead@cdatribe-nsn.gov (208) 686-6071
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Carla Marratt Coeur D'Alene Tribe No Administrative Contact cmarratt@cdatribe-nsn.gov (208) 686-6803
Shannon Stewart Bonneville Power Administration Yes Env. Compliance Lead scstewart@bpa.gov (503) 230-5928
Angelo Vitale Coeur D'Alene Tribe Yes Supervisor ajvitale@cdatribe-nsn.gov (208) 686-6903
Virgil Watts III Bonneville Power Administration Yes COR vlwatts@bpa.gov (503) 230-4625


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Outreach and Education A: 99. Outreach and Education 04/30/2007 04/30/2007
Coordinate with Stakeholders B: 118. Coordinate Restoration Efforts with Stakeholders 04/30/2007 04/30/2007
Selection of Restoration Projects C: 114. Identify and Select New Restoration Projects 04/30/2007 04/30/2007
Restoration Designs Produced D: 175. Produce Design and/or Specifications- Collect Preliminary Design Data for New Projects 04/30/2007 04/30/2007
Completed NEPA Checklist E: 165. NEPA Analysis and Documentation 04/30/2007 04/30/2007
Work Elements coordinated both internally, and regionally. F: 118. Tribal and Regional Coordination 04/30/2007 04/30/2007
In-stream channel enhancements within Indian Creek G: 29. Place Instream LWD in Indian Creek 04/30/2007
Vegetation Establishment at Indian Creek H: 47. Plant Vegetation at Indian Creek 04/30/2007
Vegetation Protected at Indian Creek I: 22. Maintain Vegetation at Indian Creek 04/30/2007 04/30/2007
Enhanced Floodplain Communities on Hangman Creek J: 47. Enhance Floodplain Plant Communities at Hangman Sweatlodge area 04/30/2007 04/30/2007
Protected Riparian Plants on Hangman Creek K: 22. Maintain Plants at Hangman Sweatlodge Location 04/30/2007 04/30/2007
Physical Habitat Data Collected L: 157. Collect Physical Habitat Data 04/30/2007 04/30/2007
Water Quality Data Collected M: 157. Collect Water Quality Data 04/30/2007 04/30/2007
Field Data Transfer N: 159. Transfer Data from Field Equipment 04/30/2007 04/30/2007
Habitat and Water Quality Databases Maintained O: 160. Maintain Water Quality and Physical Habitat Database 04/30/2007 04/30/2007
Water Quality and Physical Habitat Analyzed P: 162. Analyze Water Quality and Physical Habitat 04/30/2007
Traps Installed and Maintained Q: 70. Install and Maintain Fish Traps 04/30/2007 04/30/2007
Fish Migration Patterns Studied R: 157. Sample Fish Using Migration Traps 04/30/2007
Electroshock Sampling of Fish in Hangman Watershed S: 157. Sample Fish Using Electroshocking Equipment 04/30/2007 04/30/2007
Maintained Fisheries Database. T: 160. Maintain Fisheries Database 04/30/2007 04/30/2007
GIS Summarization of Project Data Collected U: 161. Summarize Water Quality, Physical habitat, and Fisheries using GIS 04/30/2007 04/30/2007
Population and Production Estimates with Updated Power Analysis to Detect Changes in Populations. V: 162. Analyze Data Generated from Salmonid Sampling in Target Watersheds 04/30/2007 04/30/2007
Management and Administration of Project W: 119. Manage and Administer Project 04/30/2007 04/30/2007
Annual Report Submitted Y: 132. Produce Annual Reports 04/30/2007

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Trout, Interior Redband (O. mykiss gairdnerii)
  • 2 instances of WE 22 Maintain Vegetation
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 2 instances of WE 47 Plant Vegetation
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 4 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 2 instances of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 99 Outreach and Education
B 118 Coordinate Restoration Efforts with Stakeholders
C 114 Identify and Select New Restoration Projects
D 175 Produce Design and/or Specifications- Collect Preliminary Design Data for New Projects
E 165 NEPA Analysis and Documentation
F 118 Tribal and Regional Coordination
G 29 Place Instream LWD in Indian Creek
H 47 Plant Vegetation at Indian Creek
I 22 Maintain Vegetation at Indian Creek
J 47 Enhance Floodplain Plant Communities at Hangman Sweatlodge area
K 22 Maintain Plants at Hangman Sweatlodge Location
L 157 Collect Physical Habitat Data
M 157 Collect Water Quality Data
N 159 Transfer Data from Field Equipment
O 160 Maintain Water Quality and Physical Habitat Database
P 162 Analyze Water Quality and Physical Habitat
Q 70 Install and Maintain Fish Traps
R 157 Sample Fish Using Migration Traps
S 157 Sample Fish Using Electroshocking Equipment
T 160 Maintain Fisheries Database
U 161 Summarize Water Quality, Physical habitat, and Fisheries using GIS
V 162 Analyze Data Generated from Salmonid Sampling in Target Watersheds
W 119 Manage and Administer Project
X 185 Periodic Status Reports for BPA
Y 132 Produce Annual Reports