Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 35897: 2002-072-00 EXP USFS RED RIVER WATERSHED RESTORATION
Project Number:
Title:
Red River/Newsome Creek Watershed Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Clearwater 100.00%
Contract Number:
35897
Contract Title:
2002-072-00 EXP USFS RED RIVER WATERSHED RESTORATION
Contract Continuation:
Previous: Next:
33170: 2002 072 00 EXP USFS RED RIVER WATERSHED RESTORATION
  • 41042: 2002-072-00 EXP USFS RED RIVER WATERSHED RESTORATION
Contract Status:
Closed
Contract Description:
Project/Contract History:

This project began in 2002 and became part of the Nez Perce Tribe Fisheries Watershed Department’s habitat restoration program.  In 2002, the Red River Ecosystem Analysis at the Watershed Scale (EAWS) was completed.  While this was mainly a Forest Service effort, the NPT was involved in the transportation planning and review of the document.  NPT field crews also surveyed approximately 100 miles of roads and 264 high priority culverts/stream crossings.  In 2003, the NEPA process was initiated on the Upper Red River Watershed Restoration Project which consists of road decommissioning, road improvements, one major culvert replacement, and campground improvements.  NEPA and ESA consultation were completed in 2004, as well as the engineering surveys for the road decommissioning and improvements.  

In 2005, the Bridge Creek Campground Improvements were implemented, and in 2006 - 2007 23 miles of roads were decommissioned, 9 miles of roads were improved, culvert 1709 was replaced, 5 new culvert designs have been subcontracted, 15,200 riparian plants were planted along approximately 4 miles of the mainstem of Red River, and the Red River Meadow Conservation Easement has been initiated.

This project has been, and is still currently a part of the Nez Perce National Forest - Nez Perce Tribe Watershed Restoration Partnership.  Since the project’s inception we have shared project planning, costs, and implementation responsibilities.

Summary of FY 08 Contract Implementation:

FY 08 contract implementation will include the Red River Narrows Stream Restoration project which will be implemented by the Forest Service (Nez Perce National Forest).  The Narrows Restoration project entails 2 miles of mainstem Red River post dredge mine rehabilitation which includes mine tailings pile regrading, stream channel reconstruction, and the installation of instream habitat complexity structures such as engineered log jams.  The technical oversight and associated project implementation/effectiveness monitoring and evaluation of the Narrows Project will be done by the Nez Perce Tribe under the BPA-NPT contract of this project.
Account Type(s):
Expense
Contract Start Date:
12/01/2007
Contract End Date:
11/30/2008
Current Contract Value:
$0
Expenditures:
$0

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Stephanie Bransford Nez Perce Tribe Yes Technical Contact stephanieb@nezperce.org (208) 983-0675
Mickey Carter Bonneville Power Administration No Interested Party macarter@bpa.gov (503) 230-5885
Lois Geary US Forest Service (USFS) No Administrative Contact lgeary@fs.fed.us (208) 983-7008
Amanda Hendrix Nez Perce Tribe Yes Technical Contact amandah@nezperce.org (208) 621-3542
Bruce Hollen Bonneville Power Administration No Env. Compliance Lead bahollen@bpa.gov (503) 230-5756
David Kaplowe Bonneville Power Administration Yes COR djkaplowe@bpa.gov (503) 230-5365
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Michelle Roberts US Forest Service (USFS) Yes Contract Manager mmroberts@fs.fed.us (208) 983-4091
Scott Russell US Forest Service (USFS) Yes Supervisor sarussell@fs.fed.us (208) 983-4092


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental compliance documentation submitted to BPA A: 165. Provide Environmental Compliance Documentation to BPA 05/01/2008 05/01/2008

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Provide Environmental Compliance Documentation to BPA 02/09/2007
B 30 Red River Narrows Stream Channel Reconstruction 02/09/2007
C 29 Red River Narrows Instream Structure Installation 02/09/2007
D 119 Management, Coordination and Communication 02/09/2007
E 132 Progress (Annual) Report Not Required 02/09/2007
F 185 Periodic Status Reports for BPA 02/09/2007