Contract 53956: 2010-020-00 EXP CHINOOK RIVER ESTUARY RESTORATION
Project Number:
Title:
Chinook River Estuary Restoration
BPA PM:
Stage:
Closed
Area:
Province Subbasin %
Lower Columbia Columbia Lower 100.00%
Contract Number:
53956
Contract Title:
2010-020-00 EXP CHINOOK RIVER ESTUARY RESTORATION
Contract Continuation:
Previous: Next:
n/a
  • 60411: 2010-070-00 EXP CHINOOK RIVER ESTUARY RESTORATION
Contract Status:
History
Contract Description:
This Chinook River Estuary anadromous fish habitat restoration project is a Washington MOA Project directly funded by Bonneville Power Administration.  The overall goal of this work is to provide increased and improved estuarine habitat for in-basin and out-of-basin anadromous salmonid species, with a focus on the 13 salmon ESU's and steelhead DPSs listed under the Endangered Species Act (ESA). The enhanced juvenile rearing habitat and adult holding habitat resulting from the Chinook Estuary restoration will contribute to increased survival of anadromous salmonids in the Columbia River Estuary called for in the FCRPS Biological Opinion. The work under this contract includes the following elements:

1. Pre-Acquisition actions needed to produce appraisals for (a) a 120 acre fee simple acquisition, and (b) a 100 acre conservation (flood) easement.
2. Develop the Chinook Estuary habitat Restoration Plan. This plan will address comprehensive site restoration, fish access/habitat improvement actions, re-vegetation plan and a tide gate management plan.
3. Near term habitat actions include culvert and ditch plug removal.
Account Type(s):
Expense
Contract Start Date:
08/01/2011
Contract End Date:
12/31/2012
Current Contract Value:
$372,013
Expenditures:
$372,013

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
None
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

Description: Chinook channel topo survey at Chinook Restoration Site in the Summer 2012.

Contract(s):

53956

Location: 46.297373° N, -123.948692° E

Dimensions: 1536 x 2048

Description: This is one of the largest sections of the Chinook River area. Restoration of tide inundation through tidegate management is planned.

Contract(s):

53956

Dimensions: 3264 x 1840

Description: Chinook River aerial photograph with 22 potential restoration sites shown in red while the agricultural ditches where some of the excavated material may be placed are shown in blue.

Contract(s):

53956

Dimensions: 1056 x 1632

Description: This is the staff gage at the mouth of the Chinook River that where data on Water Surface Elevations are taken a couple of times a week. There are other staff gages further up the Chinook as well as salinity meters and data loggers.

Contract(s):

53956

Location: 46.304127° N, -123.967092° E

Dimensions: 1536 x 2048

Description: This is one of the tide gates under the SR 4 bridge that is within the WSDOT right-of-way that is owned by the DNR Aquatic Lands.

Contract(s):

53956

Location: 46.303987° N, -123.967036° E

Dimensions: 2048 x 1536


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Inter-Agency Coordination for Partners in the Chinook River Estuary and Watershed and ERTG Meetings B: 191. The WDFW MOA Team will conduct Inter-Agency Coordination for Partners in The Chinook Watershed 12/31/2012
Engineering and Biological Assessment of the Chinook River Estuary D: 115. WDFW MOA Engineers will conduct an Assessment to Provide information for the Restoration Plan 04/30/2012 04/30/2012
Fish Presence and Absence Sampling E: 157. Fish Presence-Absence Sampling 12/31/2012 11/19/2012
Technical Assistance for Chinook Estuary Revegetation and Fish Habitat Restoration Plan F: 174. PNNL will provide technical assistance in the development of the Revegetation & Restoration Plans 12/31/2012 11/19/2012
Developing the Chinook Estuary Habitat Restoration Plan G: 174. WDFW R5 will be the Lead in developing the Chinook Estuary Habitat Restoration Plan for A-Fish 12/31/2012
WDFW provides relevant information to BPA EC Lead. H: 165. Environmental Compliance for Near-Term Fish Passage and Habitat Restoration Actions 12/31/2012
Develop Progress Report and Attach Report in Pisces I: 132. Submit Progress Report for the period (08-1-2011) to (09-30-2012) 12/31/2012
Public Outreach and Education for the Chinook Estuary Habitat Restoration Project J: 99. WDFW will Conduct Outreach for landowners, stakeholders and the interested public 12/31/2012
Manage Chinook Estuary Habitat Project / Develop Funding Package - Submit draft to COTR K: 119. The WDFW MOA Coordinator/Assistant will Manage the Chinook Estuary Habitat Restoration Project 05/01/2012 05/01/2012
Pre-Acquisition Activities for Flood Easement and Fee Title land M: 172. The WDFW Lands Pre-Acquisition Process will result in all steps needed to the up the Appraisals 05/30/2012 05/30/2012

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (Oncorhynchus tshawytscha) - All Populations
  • 1 instance of WE 85 Remove/Breach Fish Passage Barrier
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 2 instances of WE 174 Produce Plan
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Chum (Oncorhynchus keta) - Columbia River ESU (Threatened)
  • 1 instance of WE 85 Remove/Breach Fish Passage Barrier
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 2 instances of WE 174 Produce Plan
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Coho (Oncorhynchus kisutch) - Lower Columbia River ESU (Threatened)
  • 1 instance of WE 85 Remove/Breach Fish Passage Barrier
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 2 instances of WE 174 Produce Plan
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Cutthroat Trout, Coastal (Oncorhynchus clarkii clarkii) - All Anadromous Populations
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 1 instance of WE 174 Produce Plan
Sockeye (Oncorhynchus nerka) - All Populations
  • 1 instance of WE 115 Produce Inventory or Assessment
Steelhead (Oncorhynchus mykiss) - All Populations
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 2 instances of WE 174 Produce Plan
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened)
  • 1 instance of WE 85 Remove/Breach Fish Passage Barrier
Wildlife
  • 1 instance of WE 85 Remove/Breach Fish Passage Barrier
  • 1 instance of WE 174 Produce Plan

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 05/11/2011
B 191 The WDFW MOA Team will conduct Inter-Agency Coordination for Partners in The Chinook Watershed 05/11/2011
C 85 Cancelled 05/11/2011
D 115 WDFW MOA Engineers will conduct an Assessment to Provide information for the Restoration Plan 05/23/2012
E 157 Fish Presence-Absence Sampling 08/01/2011
F 174 PNNL will provide technical assistance in the development of the Revegetation & Restoration Plans 05/11/2011
G 174 WDFW R5 will be the Lead in developing the Chinook Estuary Habitat Restoration Plan for A-Fish 05/11/2011
H 165 Environmental Compliance for Near-Term Fish Passage and Habitat Restoration Actions 05/11/2011
I 132 Submit Progress Report for the period (08-1-2011) to (09-30-2012) 05/11/2011
J 99 WDFW will Conduct Outreach for landowners, stakeholders and the interested public 05/11/2011
K 119 The WDFW MOA Coordinator/Assistant will Manage the Chinook Estuary Habitat Restoration Project 05/11/2011
L 100 Deleted 05/11/2011
M 172 The WDFW Lands Pre-Acquisition Process will result in all steps needed to the up the Appraisals 05/11/2011