Ensure environmental compliance requirements are complete |
A: 165. Deschutes, Fifteenmile, Hood - Complete Environmental Compliance Requirements |
|
09/30/2014 |
09/30/2014 |
Summarize water temperature data (2008-13), compare to developmental stages |
B: 162. Deschutes River (DR): Summarize water temperature data (2008-13) , compare to developmental stage |
|
09/30/2014 |
09/30/2014 |
DR: Collect water temperature data |
C: 157. DR: 2013-2014 Record tributary water temperatures for lamprey life-history |
|
09/30/2014 |
09/30/2014 |
Estimate adult lamprey escapement for 2013 |
D: 162. DR: 2013 Generate Pacific lamprey escapement upstream of Sherars Falls |
|
09/30/2014 |
09/30/2014 |
Collect data associated with estimating escapement for Pacific lamprey in 2014 |
E: 157. DR: 2014 Field activities to generate Pacific lamprey escapement estimate upstream of Sherars |
|
09/30/2014 |
09/30/2014 |
Tag adult lamprey at Sherars Falls |
F: 158. DR: 2014 Tag lamprey to estimate abundance at Sherars Falls |
|
09/30/2014 |
09/30/2014 |
Operate HDX arrays in Warm Springs River and Shitike Creek |
G: 157. DR: Collect data from HDX sites on CTWSRO reservation |
|
09/30/2014 |
09/30/2014 |
Conduct end of distribution surveys |
H: 157. DR: End of distribution surveys in Warm Springs River and Shitike Creek watersheds |
|
09/30/2014 |
09/30/2014 |
Summarize water temperature data (2008-13), compare to developmental stages |
I: 162. Fifteenmile (FM): Summarize water temperature data (2008-13), compare to developmental stages |
|
09/30/2014 |
09/30/2014 |
Install LPS |
J: 184. FM: Install lamprey passage system (LPS) |
|
09/30/2014 |
09/30/2014 |
Fifteenmile Creek adult Pacific lamprey escapement estimate for summer 2013 |
K: 162. FM: 2013 Generate lamprey escapement upstream of Cushing Falls |
|
09/30/2014 |
09/30/2014 |
Conduct mark-recapture to estimate escapement |
L: 157. FM: 2014 Field activities to generate Pacific lamprey escapement estimate upstream of Cushing |
|
09/30/2014 |
09/30/2014 |
Tag lamprey |
M: 158. FM: Tag lamprey for escapement estimates |
|
09/30/2014 |
09/30/2014 |
Operation of HDX PIT Tag Arrays In Fifteenmile Creek Subbasin |
N: 157. FM: Collect Movement Data From Fifteenmile PIT Arrays |
|
09/30/2014 |
09/30/2014 |
Conduct end of distribution surveys |
O: 157. FM: End of distribution surveys in Mill Creek |
|
09/30/2014 |
09/30/2014 |
Conduct end of distribution surveys |
P: 157. FM: Ammocoete density surveys in Mill Creek |
|
09/30/2014 |
09/30/2014 |
Compile information on potential limiting factors to lamprey production |
Q: 191. FM: Collect information on potential limiting factors to lamprey production |
|
09/30/2014 |
09/30/2014 |
Install, operate, maintain and collect data from HDX arrays in the Hood River Subbasin |
R: 157. Hood River (HR): Collect data from half-duplex site in Hood River |
|
09/30/2014 |
09/30/2014 |
Analyze distribution & relative abundance data in the Deschutes, Fifteenmile, and Hood subbasins |
S: 162. DR, FM & HR: Analyze 2012-2013 larval lamprey surveys (end of distribution and abundance) |
|
09/30/2014 |
09/30/2014 |
Lamprey migration timing and movement patterns in Deschutes, Fifteenmile and Hood subbasins |
T: 162. DR, FM & HR: Summarize data collected from HDX Arrays |
|
09/30/2014 |
09/30/2014 |
Enter HDX Tag information into PTAGIS. |
U: 159. DR, FM, & HR: Enter HDX PIT tag information into PTAGIS |
|
09/30/2014 |
09/30/2014 |
Participate in regional lamprey research and recovery forums |
V: 189. DR, FM, & HR: Participate in regional planning and recovery actions for Pacific lamprey |
|
09/30/2014 |
09/30/2014 |
Lamprey Education and Outreach (E&O) |
W: 99. DR, FM, & HR Education & Outreach (E&O) |
|
09/30/2014 |
09/30/2014 |
Attach RM&E CY2013 Technical Report in Pisces |
X: 132. DR, FM, & HR: RM&E Technical Annual Report for CY2013 |
|
09/30/2014 |
06/30/2014 |
Submit Funding Package To COTR |
Z: 119. Manage Project |
|
09/30/2014 |
09/30/2014 |