SOW Report
Contract 63691: 2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION - SBT
Project Number:
Title:
Yankee Fork Salmon River Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
63691
Contract Title:
2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION - SBT
Contract Continuation:
Previous: Next:
60303: 2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION
  • 67810: 2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION
Contract Status:
Closed
Contract Description:
The overall goal of the Shoshone-Bannock Tribes is the recovery of Chinook salmon and Steelhead within the Salmon River Basin and the Columbia River Basin with the approach to protect, enhance, and restore habitats to sustain and recover native aquatic and terrestrial species diversity and abundance with emphasis on the recovery and delisting of Endangered Species Act listed species. The goal is to enhance these species populations to healthy levels that support Tribal Treaty and public harvest goals.  The Tribes interest is the protection and restoration of natural ecological functions and habitats. The Yankee Fork Restoration Project’s 2014 implementation objectives are to 1) reconnect historic channel and floodplain interaction, re-establish dynamic channel and floodplain interactions where they have been disconnected through  anthropogenic disturbances; 2) Floodplain enhancement and instream complexity, Re-establish channel dynamics and floodplain interactions by improving floodplain patch size, creating or improving side channel habitats, planting appropriate vegetation, placing large wood for fish cover and complexity, and constructing instream structures; 3) Adaptive Management, Monitor rehabilitated areas, and modify past rehabilitation actions to improve and/or diversify habitats and processes to maximize fish benefits.
The Tribes fish and wildlife programs will work synergistically to improve habitat conditions and improve fish abundance.  The Yankee Fork Inter-Disciplinary team along with the Tribes, has determined the short and long term goals of the Yankee Fork: short term goals involve restoration actions through 2018 (utilizing the Shoshone-Bannock Tribes Accord funds), which include implementing projects from the Tributary Assessment and Reach Assessments that identified the Dredged sections of Yankee Fork (Bonanza reach and Pole Flat reach) the most impacted and altered, therefore having the greatest potential for habitat restoration. Other short term goals are to finalize a solid RME plan for the Yankee Fork for habitat and wildlife. Long term goals are to rehabilitate aquatic and riparian habitat in the Yankee Fork sufficient to increase abundance of salmon and steelhead populations to meet Tribal conservation and harvest objectives.
Summer 2013, the Yankee Fork Restoration Project went before NWPCC with a 2013 Geographic Review, GEOREV 2002-059-00 Lower Yankee Fork Implementation Plan 2008-2018, and had positive review to move forward with Yankee Fork rehabilitation projects through 2018; with this positive review the Shoshone Bannock Tribes Yankee Fork Restoration Project, other Tribal F&W projects and the YF Inter-Disciplinary team will work to implement projects within the Yankee Fork Salmon River drainage.  The Yankee Fork Fish Habitat Monitoring Plan (CHaMP) is part of the Shoshone-Bannock Tribes’ Research Monitoring and Evaluation (RM&E) Plan that is being developed to support implementation of a comprehensive salmon and steelhead protection, restoration and mitigation program.  This Habitat Monitoring Plan specifically addresses the Yankee Fork Restoration Project and has begun summer 2013. Construction and enhancement was completed in fall of 2012 at Pond Series 3, creating side channel habitat; to determine the outcome of the actions of the creation of side channel, monitoring and evaluation tasks  begun in 2013.  The team implemented Pond Series 3 Side Channel in 55 days (within months of construction the side channel had Steelhead spawning and salmonid juveniles utilizing the channel); in 2013, the Pond Series 2 was completed in 2 weeks and the team plans on completing Preacher's Cove section in 2014, keeping the momentum for Yankee Fork.
The Tribes is currently working collaboratively to produce a research, monitoring and evaluation for the Upper Salmon Basin, the project will use it specifically for the YFSR and all restoration actions completed.  This is a working document and is important to the Tribes; therefore, we are putting time and effort into the process. The project will be utilizing methods in parallel until completion of the RM&E. The Yankee Fork Fish Habitat Monitoring Plan will implement the Columbia Habitat Monitoring Program (CHaMP) sampling protocol and sample design.  CHaMP is a Columbia River basin-wide habitat status, trends and effectiveness monitoring program that was developed to capture habitat features that drive fish population biology in order to provide systematic habitat status and trends data.  CHaMP is being implemented in the Yankee Fork watershed to evaluate the status and trend (quality and quantity) of fish habitat conditions and assess the effectiveness of restoration activities. The Yankee Fork Habitat Monitoring study design will combine CHaMP with a modified before-after-control-impact (BACI) study design, used frequently for impact monitoring.  Fish habitat data will be collected at control and impact sites before restoration and after restoration activities. These sites will be determined by using similar geomorphic reach types as established by the Bureau of Reclamation (Reclamation, 2012b and 2012c).  The Lower Yankee Fork Implementation Plan 2008-2018 will inform the monitoring study design, specifically the spatial and temporal allocation of sites in the watershed. Fish habitat monitoring in the Yankee Fork will start in 2013 and continue through 2018, beginning with 25 sample sites and ending with 45 sites, based on the CHaMP three-year rotating panel design.  In 2013, six effectiveness monitoring sites and 19 status and trend sites will be sampled determined based upon planned restoration activities.  Although the Yankee Fork Restoration Project is not fully funding the CHaMP sampling protocol, the project is benefiting from the data collection of CHaMP, through the ESA habitat program, Shoshone Bannock Fish and Wildlife Department.  The project will benefit and assist where needed with snorkel and macro-invertebrate protocols.
The project will continue baseline data collection consisting of water quality data, physical and biological surveying, and permanent photo points for the contract year 2014. We will continue to collect data in the YFSR with the use of Sondes, temperature thermographs, discharge measurements, and monitor fish activity/macro-invertebrate collections within rehabilitated sites (PS2, PS3 and CHaMP sites). Water quality monitoring will include long term deployment of multi-parameter water quality monitors (Sondes) at five or more sites: Flat Rock, Bonanza Bridge, West Fork Yankee Fork and the pond series 2-4 (rotating). The data collection of continuous water quality will begin April and continue through November. The sondes will measure: pH, conductivity, temperature, turbidity, and dissolved oxygen and is dependent upon the stream conditions and storm events.  Temperature data will be collected throughout the Yankee Fork and tributaries. The project installs water thermal data loggers beginning in April and retrieves them in November as conditions permit, and will be collecting data throughout the year, at various sites, commencing in February 2014 and continuing through January 2015; Discharges measurements will be collected throughout the system as well. We will continue working with USGS to maintain the gauging station (13296200 Yankee Fork above Salmon River Confluence near Clayton, ID) and the USGS will conduct a sediment transport study 2013-2014.  In 2011 a USGS gauging station was placed on the lower end of the Yankee Fork Salmon River; the USGS will maintain this station while publishing the data on the USGS website presently and near future. It will be helpful to determine what the sediment transport out of the YFSR.  The USGS is providing half the costs to maintain the gauging station and sediment transport curve.
The project will continue to work with the Yankee Fork Inter-Disciplinary team (BOR, TU, USFS, SBT, USFW, and others) to update the a "working" Yankee Fork Master Plan; prioritizing the enhancement of in-stream diversity, floodplain function, re-connecting tributaries, etc. Once again, the team has an opportunity to begin implementing projects in 2014, Preacher's Cove, River mile 7.45-8.35, with the "sticks and stones" project. This includes installation of several boulder clusters and LWD within this bedrock migratory section in the upper sections of the dredge reach. As a team, we are successfully moving forward with restoration actions within the Yankee Fork Salmon River; the Tribes have a long time understanding and previous commitments within the Yankee Fork drainage and look forward to continue working and having traditional and cultural significance increase within this drainage and throughout the Salmon River and Columbia River Basin.
Account Type(s):
Expense
Contract Start Date:
02/01/2014
Contract End Date:
01/31/2015
Current Contract Value:
$308,052
Expenditures:
$308,052

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Boyd Bouwes Watershed Solutions, Inc. No Interested Party boydbouwes@gmail.com (208) 315-5864
Chad Colter Shoshone-Bannock Tribes No Supervisor ccolter@sbtribes.com (208) 239-4553
Joe Deherrera Bonneville Power Administration Yes COR jldeherrera@bpa.gov (503) 230-3442
Paul Drury US Bureau of Reclamation (BOR) No Interested Party pdrury@usbr.gov (208) 378-5076
Israel Duran Bonneville Power Administration Yes Env. Compliance Lead induran@bpa.gov (503) 230-3967
Jacee Furniss Shoshone-Bannock Tribes No Administrative Contact jfurniss@sbtribes.com (208) 239-4551
Evelyn Galloway Shoshone-Bannock Tribes Yes Technical Contact egalloway@sbtribes.com (208) 239-4570
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Ed Lyon US Bureau of Reclamation (BOR) No Interested Party elyon@usbr.gov (208) 378-5305
Gaylene Turnage Shoshone-Bannock Tribes No Administrative Contact gturnage@sbtribes.com (208) 478-3821
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Shannell Ward Shoshone-Bannock Tribes No Administrative Contact shannell.ward@sbtribes.com (208) 478-3821


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
approval from BPA A: 165. Environmental compliance to install monitoring equipment 07/31/2014 07/31/2014
Summary of meeting notes B: 191. Yankee Fork Interdisciplinary team Meetings and Upper Salmon River Tech Team meetings 01/31/2015 01/31/2015
Annual report C: 157. Collect Water Quality Data 01/31/2015 01/31/2015
Annual report D: 162. Analyze Water Quality 01/31/2015 01/31/2015
summarized water quality tabled to agencies E: 161. Disseminate water quality 01/30/2015 01/30/2015
confirm installation of PS3 side channel pit tag arrays F: 70. install/monitor Pit tag Arrays 04/30/2014 04/22/2014
Disseminate pit tag data G: 161. disseminate pit tag data 01/31/2015 01/31/2015
confirm that sites are snorkeled H: 157. Snorkel CHaMP sites 11/07/2014 11/07/2014
confirm delivery to interested parties I: 161. Disseminate Snorkel Data 01/31/2015 01/31/2015
macro invertebrate sample collections J: 157. Collect macroinvertebrate at CHaMP sites 11/07/2014 11/07/2014
confirm samples sent off K: 161. Disseminate macroinvertebrate data 12/01/2014 12/01/2014
All administrative tasks fulfilled with timely quality products L: 119. Routine administration of contract 01/30/2015 01/30/2015

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 4 instances of WE 161 Disseminate Raw/Summary Data and Results
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 3 instances of WE 161 Disseminate Raw/Summary Data and Results
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental compliance to install monitoring equipment 02/01/2014
B 191 Yankee Fork Interdisciplinary team Meetings and Upper Salmon River Tech Team meetings 02/01/2014
C 157 Collect Water Quality Data 11/18/2013
D 162 Analyze Water Quality 02/01/2014
E 161 Disseminate water quality 02/01/2014
F 70 install/monitor Pit tag Arrays 11/18/2013
G 161 disseminate pit tag data 02/01/2014
H 157 Snorkel CHaMP sites 02/01/2014
I 161 Disseminate Snorkel Data 02/01/2014
J 157 Collect macroinvertebrate at CHaMP sites 02/01/2014
K 161 Disseminate macroinvertebrate data 02/01/2014
L 119 Routine administration of contract 02/01/2014
M 132 Submit Progress Report for the period February 2013 to January 2014 02/01/2014
N 132 Progress Report for this project period to be submitted in FY15 02/01/2014
O 185 Periodic Status Reports for BPA 02/01/2014