| Province | Subbasin | % |
|---|---|---|
| Mountain Snake | Salmon | 100.00% |
* Expenditures data includes accruals and are based on data through 30-Nov-2025.
| Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
|---|---|---|---|---|
| Provide Necessary Environmental Compliance documentation for relevant projects | A: 165. Produce Environmental Compliance Documents for projects | 07/29/2016 | 07/19/2016 | |
| Designs and Specifications and project installation oversight from NRCS on BPA projects | B: 175. NRCS Technical Engineer and Challis position | 07/31/2017 | 07/31/2017 | |
| Restore and reconnect Pole Creek to it's Historic Channel in Upper Stanley | C: 30. Restore/reconnect Pole Creek to historic channel in Upper Stanley | 11/11/2016 | 10/21/2016 | |
| Install seven Stock-water tanks for the stock-water system to complete Pole Creek Restoration | D: 34. Install stock-water system to complete Pole Creek Restoration | 09/30/2016 | 08/26/2016 | |
| Plant Vegetation at Pole Creek behind riparian fence | E: 47. Plant Vegetation on Pole Creek within fenced riparian area | 07/31/2017 | ||
| Remove Fish Passage Barrier and transport water in a pipe supplied to irrigators by the Gini Canal | F: 85. Remove Garden Creek Lower Diversion Structure | 04/28/2017 | 09/27/2016 | |
| Install Approximately 2400 feet of Jack Post and Pole Fence on Salmon River and Williams Creek | H: 40. Install Fence at Rocky Mountain Ranch in Upper Stanley | 06/30/2017 | 06/30/2017 | |
| Monitor and assist with maintenance on at least six BPA funded projects 8-10 years old. | I: 186. Monitor and assist with maintenance of fence projects to maintain BPA investment | 07/31/2017 | 07/31/2017 | |
| Visitation Log | J: 26. Investigate Trespass on Easement Property | 07/31/2017 | 07/31/2017 | |
| Conduct Education and Outreach Program to target key habitat and passages areas within CSWCD. | K: 99. Provide Outreach and Education for Habitat Projects | 07/31/2017 | 07/31/2017 | |
| Identify and Select Individual Projects | L: 114. Identify and develop habitat projects | 05/31/2017 | 07/31/2017 | |
| All administrative tasks fulfilled with timely quality products | M: 119. Routine contract actions | 07/31/2017 | 07/31/2017 | |
| Attach Progress Report in Pisces | O: 132. Annual Report for the period May 1 2015 through April 30, 2016 | 08/05/2016 | 06/30/2016 |
| Primary Focal Species | Work Statement Elements |
|---|---|
| Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened) |
|
| Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened) |
|
| Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU |
|
| Sockeye (O. nerka) - Snake River ESU (Endangered) |
|
| Steelhead (O. mykiss) - Snake River DPS (Threatened) |
|
| Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
|---|---|---|---|---|---|---|---|---|---|
| A | 165 | Produce Environmental Compliance Documents for projects | 05/01/2016 | ||||||
| B | 175 | NRCS Technical Engineer and Challis position | 05/01/2016 | ||||||
| C | 30 | Restore/reconnect Pole Creek to historic channel in Upper Stanley | 06/02/2016 | ||||||
| D | 34 | Install stock-water system to complete Pole Creek Restoration | 06/06/2016 | ||||||
| E | 47 | Plant Vegetation on Pole Creek within fenced riparian area | 06/06/2016 | ||||||
| F | 85 | Remove Garden Creek Lower Diversion Structure | 08/19/2016 | ||||||
| G | 40 | Install Fence near Herd Creek, in East Fork | |||||||
| H | 40 | Install Fence at Rocky Mountain Ranch in Upper Stanley | 05/01/2016 | ||||||
| I | 186 | Monitor and assist with maintenance of fence projects to maintain BPA investment | 05/01/2016 | ||||||
| J | 26 | Investigate Trespass on Easement Property | 05/01/2016 | ||||||
| K | 99 | Provide Outreach and Education for Habitat Projects | 05/01/2016 | ||||||
| L | 114 | Identify and develop habitat projects | 05/01/2016 | ||||||
| M | 119 | Routine contract actions | 05/01/2016 | ||||||
| N | 185 | Periodic Status Reports for BPA | 05/01/2016 | ||||||
| O | 132 | Annual Report for the period May 1 2015 through April 30, 2016 | 05/01/2016 |