Contract 76913 REL 28: 2008-604-00 EXP LOWER CLEARWATER/POTLATCH WATERSHED
Project Number:
Title:
Lower Clearwater and Potlatch Watersheds Habitat Improvements
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Clearwater 100.00%
Contract Number:
76913 REL 28
Contract Title:
2008-604-00 EXP LOWER CLEARWATER/POTLATCH WATERSHED
Contract Continuation:
Previous: Next:
76913 REL 20: 2008-604-00 EXP LOWER CLEARWATER/POTLATCH WATERSHED
  • 76913 REL 37: 2008-604-00 EXP LOWER CLEARWATER/POTLATCH WATERSHED
Contract Status:
Closed
Contract Description:
This project is intended to implement habitat restoration activities in the Potlatch River Basin as identified in The Accord. The 377,776-acre Potlatch River watershed is located in north-central Idaho and is the largest tributary in the lower Clearwater River. The Potlatch River is critical to wild Snake River steelhead. This project seeks to restore wild Snake River Steelhead to a robust, self-sustaining population within the Potlatch River through coordinated implementation of best management practices on private timber, agricultural and range lands, coordination of interagency watershed planning efforts, and continuation of watershed monitoring and evaluation. This proposal is consistent with the NWPCC Fish and Wildlife Program’s goal to develop habitat-based programs designed to rebuild healthy, naturally producing fish and wildlife populations by protecting, mitigating, and restoring habitats. This project is consistent with the objectives and strategies of the Clearwater Subbasin Management Plan.

This project is intended to implement the Potlatch River Watershed Management Plan - 2019 Amendment (Potlatch Plan). The Potlatch Plan has identified and prioritized limiting factors and restoration strategies critical to steelhead spawning and rearing within each subwatershed. Tier 1 priority tributaries for restoration work include: East Fork Potlatch River, Big Bear Creek (including Little Bear Creek), and Corral Creek. Projects will address limiting factors including removing migration barriers, increasing instream habitat complexity, reducing stream temperature and sediment load, increasing base flows, and reducing high spring run conditions. Implementation efforts will include but are not limited to repair, removal or replacement of old culverts and bridges, stream and floodplain reconnection, reservoir flow augmentation, installation of large woody debris and other instream habitat structures, implementation of erosion/sediment control structures, riparian planting, livestock exclusion fencing, off-site water development, and protection of riparian and floodplain areas through easements or direct purchase.

It is intended that project staff will continue to seek additional non-BPA funds to implement best management practices designed for the improvement of steelhead spawning and rearing habitat. Project staff will also continue coordination efforts with other watershed planning efforts throughout the region to improve fish habitat.

The primary objectives of this contract include:

- Identify, plan, design, fund and implement high priority habitat restoration actions to improve steelhead habitat within the Potlatch River watershed cooperatively with Pacific Coast Salmon Recovery Funds.
- Implement restoration efforts on the Lower Fry Meadow steelhead habitat LWD restoration project on the lower East Fork of the Potlatch River;
- Work with BPA to evaluate alternatives, develop final design, and complete consultation for Spring Valley Reservoir flow augmentation.
- Develop new projects.  
Account Type(s):
Expense
Contract Start Date:
07/01/2021
Contract End Date:
06/30/2022
Current Contract Value:
$211,533
Expenditures:
$211,533

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Ryan Banks Idaho Governor's Office of Species Conservation Yes Technical Contact ryan.banks@osc.idaho.gov (208) 791-3014
Matt Belnap Idaho Department of Fish and Game (IDFG) Yes Technical Contact matt.belnap@idfg.idaho.gov (208) 569-1283
Gary Byrne Idaho Department of Fish and Game (IDFG) Yes Interested Party gary.byrne@idfg.idaho.gov (208) 287-2778
Dominique Cota Idaho Governor's Office of Species Conservation Yes Technical Contact dominique.cota@osc.idaho.gov (208) 332-1550
Mike Edmondson Idaho Governor's Office of Species Conservation Yes Supervisor mike.edmondson@osc.idaho.gov (208) 334-2189
Brenda Erhardt Latah Soil and Water Conservation District (SWCD) Yes Interested Party berhardt@latahswcd.org (208) 874-3821
Graham Freeman Idaho Governor's Office of Species Conservation Yes Technical Contact graham.freeman@osc.idaho.gov (208) 332-1555
Mike Greiner Idaho Department of Fish and Game (IDFG) Yes Technical Contact michael.greiner@idfg.idaho.gov (208) 799-5010
Robert Hand Idaho Department of Fish and Game (IDFG) Yes Technical Contact robert.hand@idfg.idaho.gov (208) 750-4209
Amy Hines Idaho Governor's Office of Species Conservation Yes Contract Manager amy.hines@osc.idaho.gov (208) 332-1557
David Kaplowe Bonneville Power Administration Yes Supervisor djkaplowe@bpa.gov (503) 230-5365
Paul Kline Idaho Department of Fish and Game (IDFG) No Interested Party paul.kline@idfg.idaho.gov (208) 287-2788
Eric Leitzinger Bonneville Power Administration Yes F&W Approver ejleitzinger@bpa.gov (503) 230-3534
Jennifer McKenna Bonneville Power Administration No CO Assistant jmmckenna@bpa.gov (503) 314-8915
Matthew Schwartz Bonneville Power Administration Yes COR mdschwartz@bpa.gov (503) 230-4225
Carolyn Sharp Bonneville Power Administration Yes Env. Compliance Lead casharp@bpa.gov (503) 230-5206
Ken Stinson Latah Soil and Water Conservation District (SWCD) Yes Interested Party kstinson@latahswcd.org (509) 338-2549
George Zamora Latah Soil and Water Conservation District (SWCD) No Interested Party gzamora@latahswcd.org (208) 874-7982
Elham Zolmajd-Haghighi Bonneville Power Administration Yes Contracting Officer ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental Compliance and Consultation Review A: 165. Environmental Compliance and Consultation Review 06/30/2022 06/29/2022
Effective implementation management and timely contract administration B: 119. Project management and administration 06/30/2022 06/29/2022
Future Project Identification C: 114. IDFG: Lower Clearwater/Potlatch Project Identification 06/30/2022 06/29/2022
EF Potlatch-Lower Fry Meadow: Install LWD D: 29. EF Potlatch- Lower Fry Meadow Large Wood Enhancement Project 01/31/2022 09/13/2021
Unscheduled maintenance/repairs completed as needed F: 186. Unscheduled maintenance & repair 06/30/2022 06/29/2022
Annual progress report submitted G: 132. Annual report for Contract 76913 REL 20 (July 2020-June 2021) 01/31/2022 01/27/2022
Preliminary development of Spring Valley Flow Augmentation Plan I: 174. Spring Valley Reservoir Flow Augmentation Feasibility 06/30/2022 06/29/2022

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 175 Produce Design
Trout, Rainbow (Oncorhynchus mykiss)
  • 1 instance of WE 174 Produce Plan

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental Compliance and Consultation Review
B 119 Project management and administration
C 114 IDFG: Lower Clearwater/Potlatch Project Identification
D 29 EF Potlatch- Lower Fry Meadow Large Wood Enhancement Project 08/23/2021
E 175 Big Bear Falls Passage Design 04/01/2022
F 186 Unscheduled maintenance & repair 07/01/2021
G 132 Annual report for Contract 76913 REL 20 (July 2020-June 2021)
H 185 Periodic Status Reports for BPA
I 174 Spring Valley Reservoir Flow Augmentation Feasibility 01/14/2022