Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 78267: 2007-397-00 EXP JOHN DAY TRIB/PASS & FLOW
Project Number:
Title:
John Day Watershed Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau John Day 100.00%
Contract Number:
78267
Contract Title:
2007-397-00 EXP JOHN DAY TRIB/PASS & FLOW
Contract Continuation:
Previous: Next:
71619: 2007-397-00 EXP JOHN DAY TRIB/PASS & FLOW
  • 81294: 2007-397-00 EXP JOHN DAY TRIB/PASS & FLOW
Contract Status:
Closed
Contract Description:
The goal of this project is to address limiting factors by implementing restoration actions that protect and restore passage, flow, and habitat for anadromous fish and listed species in the John Day River Basin. This includes use of the John Day Basin Watershed Restoration Strategy to assist the Confederated Tribes of Warm Springs (CTWS), John Day Watershed Restoration Program with the ability to focus on implementing suites of restoration actions that will more effectively address priority-limiting factors.

The John Day River basin is within the CTWS ceded lands and supporting restoration efforts such as this project is an important part of maintaining cultural foods and fish populations. The mission of the CTWS Branch of Natural Resources Fisheries Department is to provide fisheries populations at harvestable levels for tribal members using information gained from research, management, production, and habitat programs while exercising co-management authority across ceded lands and usual and accustomed stations. In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) formed partnerships with local agencies and stakeholders to implement restoration actions.

The John Day is the nation’s second longest free-flowing river in the contiguous United States and the longest containing entirely un-supplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, Oregon's fourth largest drainage basin, and incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the John Day River flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon and summer steelhead, westslope cutthroat, and redband and bull trout, the John Day system is truly a basin with national significance.

The John Day Watershed Restoration Program (JDWR) objectives include removing fish passage impediments, increasing stream flow, increasing water quality, and enhancing riparian and stream channel recovery. Though benefits most readily apply to fish species, the cumulative effects apply to basin-wide watershed recovery.

Projects implemented by CTWS under this contract are intended to address limiting factors outlined in the CTWS John Day Basin Watershed Restoration Strategy, 2015. These projects respond directly to, and are also consistent with, tribal, state, and federal goals and objectives within the region's plans and programs. Previous projects of these types have demonstrated success in addressing limiting factors identified for salmonid production in the basin. They follow comprehensive assessments of the watershed, the John Day Subbasin plan and Mid-Columbia Steelhead Recovery Plan. The benefits are to entirely wild stocks and associated habitats. Each project utilizes standard design criteria, and was selected using an evaluation and prioritization process.

CTWS implements projects described in this contract and also works with partner agencies to complete landowner contacts, preliminary planning, engineering designs, permitting, construction contracting, and construction implementation phases. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife (ODFW). The projects implemented through this program are strictly voluntary and the majority on private land, these multi-agency partnerships are essential to local support and private landowner involvement. Project efforts rely and build adaptively upon previous and ongoing activities.

Through the Accord period (2008-2017) with extension into 2018 active restoration projects have and will be implemented throughout the John Day Basin, through the CTWS JDWR under this contract. Actions going forward from 2015 will be prioritized using the CTWS John Day Basin Watershed Restoration Strategy.
Account Type(s):
Expense
Contract Start Date:
02/01/2018
Contract End Date:
01/31/2019
Current Contract Value:
$2,010,684
Expenditures:
$2,010,684

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Amy Charette Confederated Tribes of Warm Springs Yes Contract Manager amy.charette@ctwsbnr.org (541) 575-1866
Jay Chong Bonneville Power Administration Yes Contracting Officer jxchong@bpa.gov (503) 230-4007
Andrew Clare Confederated Tribes of Warm Springs No Interested Party andrew.clare@ctwsbnr.org (541) 575-1866
Israel Duran Bonneville Power Administration Yes Env. Compliance Lead induran@bpa.gov (503) 230-3967
Desmond Gelman Bonneville Power Administration No CO Assistant dxgelman@bpa.gov (503) 230-4960
Brad Houslet Confederated Tribes of Warm Springs No Interested Party brad.houslet@ctwsbnr.org (541) 553-2039
Leona Ike Confederated Tribes of Warm Springs No Administrative Contact leona.ike@wstribes.org (541) 553-3219
Dennis Johnson Confederated Tribes of Warm Springs No Interested Party dennis.johnson@wstribes.org (541) 553-3479
Stefan Kelly Confederated Tribes of Warm Springs No Interested Party stefan.kelly@ctwsbnr.org (541) 575-1866
Carmen Leguizamon Confederated Tribes of Warm Springs Yes Technical Contact carmen.leguizamon@ctwsbnr.org (541) 575-1866
Joseph Lemanski Confederated Tribes of Warm Springs Yes Technical Contact joe.lemanski@ctwsbnr.org (248) 408-4074
Nicole Lexson Confederated Tribes of Warm Springs No Interested Party nicole.lexson@ctwsbnr.org (541) 575-1866
John Skidmore Bonneville Power Administration Yes F&W Approver jtskidmore@bpa.gov (503) 230-5494
Deana Smith Confederated Tribes of Warm Springs No Interested Party deana.smith@ctwsbnr.org (541) 777-2844
Scott Turo Confederated Tribes of Warm Springs Yes Supervisor scott.turo@ctwsbnr.org (541) 553-2025
Sean Welch Bonneville Power Administration No Interested Party spwelch@bpa.gov (503) 230-7691
Jesse Wilson Bonneville Power Administration Yes COR jcwilson@bpa.gov (503) 230-4506


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Effective implementation management and timely contract administration A: 119. Manage Administer Projects 01/31/2019 01/31/2019
Completed Environmental Compliance Documentation B: 165. Produce Environmental Compliance Documentation 01/31/2019 01/31/2019
Outreach and Education C: 99. John Day Basin Office Education and Outreach 01/31/2019 01/31/2019
Develop or update (out-year) prioritized Habitat Project list: upload to Pisces D: 114. Structured Implementation 01/31/2019
Habitat and Passage Structures Monitored G: 186. Implementation Effectiveness Monitoring 01/31/2019 01/31/2019
Collect Temperature Data H: 157. John Day Temperature Monitoring 01/31/2019 01/31/2019
Data collected I: 157. Collection of Biological and Ecological Data 01/31/2019 01/31/2019
Produce accessible, error-checked datasets J: 157. Middle Fork Gaging Station Operations and Maintenance 01/31/2019 01/31/2019
Produce accessible, error-checked datasets K: 157. Cottonwood Action to Stabilize Temperature (CAST) Monitoring 01/31/2019 01/31/2019
Produce accessible, error-checked datasets L: 157. Evaluation of BDAs to improve juvenile steelhead production by maintaining perennial flows to provide a migration corridor and suitable habitat in Bear Creek 01/31/2019 01/31/2019
Tag up to 3,100 steelhead M: 158. Mark-Recapture Studies 01/31/2019 01/31/2019
Interpretation and Analysis of Field Data N: 162. Analysis and Interpretation of Field Data Collected From Fisheries Surveys 01/31/2019 01/31/2019
ID/IQ Engineering Support O: 175. IDIQ Engineering Support 01/31/2019 01/31/2019
John Day Basin Partnership Facilitation P: 191. John Day Basin Partnership 01/31/2019 01/31/2019
Completed channel construction Q: 30. Fox Creek Mid Reach 10 Habitat Restoration - Channel Realignment 10/31/2018 10/31/2018
Complete Instream Construction R: 29. Fox Creek Mid Reach 10 Habitat Restoration - Instream Habitat 01/31/2019 12/31/2018
Complete Riparian Planting S: 47. Fox Creek Mid Reach 10 Habitat Restoration - Riparian Planting 01/31/2019 12/31/2018
Install Riparian Fence T: 40. Fox Creek Mid Reach 10 Habitat Restoration - Riparian Fence 01/01/2019 12/31/2018
Complete Juniper Removal U: 199. Fox Creek Mid Reach 10 Habitat Restoration - Juniper Removal 01/31/2019 12/31/2018
Install Off Channel Stock Water Troughs V: 34. Fox Creek Mid Reach 10 Habitat Restoration - Off Channel Stock Water 01/31/2019 01/31/2019
Fox Creek Reach 18 Habitat Design W: 175. Fox Creek Reach 18 Habitat Restoration - Final Design 01/31/2019 01/31/2019
Remove Juniper Trees Y: 199. Fox Creek Reach 18 Habitat Restoration - Juniper Removal 01/31/2019 12/31/2018
Fox Creek Upper Reach 10 Design Z: 175. Fox Creek Upper Reach 10 Passage and Habitat Design 01/31/2019
Fox Creek Reach 9 and Lower Reach 10 Design AA: 175. Fox Creek Reach 9 and Lower Reach 10 Habitat Project Design 01/31/2019
Phipps Meadow Restoration Design AD: 175. Phipps Meadow Restoration Design 01/31/2019
Complete Wiwaanaytt Meadow Phase 3 AE: 29. Wiwaanaytt Meadow Restoration Phase 3 - Habitat Complexity 11/30/2018 11/30/2018
Completed channel construction AF: 30. Wiwaanaytt Meadow Restoration Phase 3 - Channel Realignment 11/30/2018 11/30/2018
Complete Wiwaanaytt Meadow Phase 3 AG: 181. Wiwaanaytt Meadow Restoration Phase 3 - Wetland Enhancement 11/30/2018 11/30/2018
Complete Wiwaanaytt Meadow Phase 3 AH: 85. Wiwaanaytt Meadow Restoration Phase 3 - Barrier Removal 11/30/2018 11/30/2018
Cottonwood Creek Engle Passage Design AK: 175. Cottonwood Creek Engle Passage Design 01/31/2019
Complete Bear Creek Juniper Treatment AL: 199. Bear Creek Juniper Treatment 01/31/2019 01/31/2019
Complete riparian planting AM: 47. Neal Habitat Long Creek 01/31/2019 12/31/2018
Complete Plant Vegetation Maintenance AN: 198. Riparian Plant Maintenance 01/31/2019 12/31/2018
Develop or update (out-year) prioritized Habitat Project list: upload to Pisces AO: 114. John Day Basin Conservation Officer 01/31/2019
Complete land management plan AQ: 193. GSG Easement Management Plan 12/31/2018
Conduct Lonerock Ridge Juniper Project AR: 199. Lonerock Ridge Juniper Project 01/31/2019 01/31/2019
Completed Annual Report AT: 132. Submit Progress Report for the period (February 2016) to (January 2018) 01/31/2019 01/31/2019
Produce Final Assessment AU: 115. CCR-40402 Middle Fork Riparian Vegetation Plan 01/31/2019 01/31/2019
Complete Design of Irrigation Diversion Work AV: 175. CCR-40402 Rock Creek Diversion Design 01/31/2019
Produce Design AW: 175. CCR-40402 Reynolds Creek Ditch Design 01/31/2019
Bridge Delivered AX: 85. CCR-40402 Fox Creek Reach 18 Habitat Restoration - Remove Passage barrier 01/31/2019
Purchase and deliver stock tank for off channel water source AY: 34. CCR-40402 Fox Creek Reach 18 Habitat Restoration - Provide Off Channel Stock Water Trough 01/31/2019 12/31/2018
Install Riparian Fence AZ: 40. CCR-40402 Fox Creek Reach 18 Habitat Restoration - Install Riparian Fence 01/31/2019 01/31/2019
Construct Buck and Pole Aspen Protection Fence BA: 40. CCR-40402 Fox Creek Reach 18 Habitat Restoration - Install Aspen Protection Fence 01/31/2019 01/31/2019
Procure and Install Pump Station BB: 84. CCR-040402 Fox Creek Reach 18 Habitat Restoration - Pump Station 01/31/2019
Procure and install pipeline BC: 203. CCR-040402 Fox Creek Reach 18 Habitat Restoration - Install Pipeline 01/31/2019
Propagate Riparian Plants for the Middle Fork John Day River BD: 47. CR-040402 Middle Fork John Day Plant Propagation 01/31/2019
Complete Contract for Irrigation ID/IQ BE: 175. CR-040402 Upper John Day Irrigation IDIQ 01/31/2019
Produce 60% Design BF: 175. CCR-040402 Upper John Day Habitat Design 01/31/2019
Produce basin-wide reach-scale (1km resolution) thermal model. BG: 157. CCR-040402 John Day Temperature Monitoring - Expanded Scope 01/31/2019 01/31/2019

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (Oncorhynchus tshawytscha) - All Populations
  • 1 instance of WE 198 Maintain Vegetation
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 1 instance of WE 193 Produce Land Management Plan
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 55 Erosion and Sedimentation Control
  • 1 instance of WE 181 Create, Restore, and/or Enhance Wetland
  • 1 instance of WE 85 Remove/Breach Fish Passage Barrier
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 4 instances of WE 114 Identify and Select Projects
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 7 instances of WE 175 Produce Design
  • 5 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (Oncorhynchus mykiss) - All Populations
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 175 Produce Design
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 5 instances of WE 199 Remove Vegetation
  • 1 instance of WE 193 Produce Land Management Plan
  • 1 instance of WE 198 Maintain Vegetation
  • 1 instance of WE 203 Install Water Conservation Measure
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 2 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 2 instances of WE 30 Realign, Connect, and/or Create Channel
  • 2 instances of WE 34 Develop Alternative Water Source
  • 3 instances of WE 40 Install Fence
  • 2 instances of WE 47 Plant Vegetation
  • 1 instance of WE 55 Erosion and Sedimentation Control
  • 1 instance of WE 181 Create, Restore, and/or Enhance Wetland
  • 1 instance of WE 84 Remove/Install Diversion
  • 2 instances of WE 85 Remove/Breach Fish Passage Barrier
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 4 instances of WE 114 Identify and Select Projects
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 12 instances of WE 175 Produce Design
  • 5 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 1 instance of WE 162 Analyze/Interpret Data
Lamprey, Pacific (Entosphenus tridentata)
  • 4 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Cutthroat Trout, Westslope (O. c. lewisi)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Trout, Rainbow (Oncorhynchus mykiss)
  • 1 instance of WE 199 Remove Vegetation

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Manage Administer Projects 02/01/2018
B 165 Produce Environmental Compliance Documentation 02/01/2018
C 99 John Day Basin Office Education and Outreach 02/01/2018
D 114 Structured Implementation 02/01/2018
E 114 Western Juniper Treatment Identification 02/01/2018
F 114 Program Support 02/01/2018
G 186 Implementation Effectiveness Monitoring 02/01/2018
H 157 John Day Temperature Monitoring 02/01/2018
I 157 Collection of Biological and Ecological Data 07/12/2018
J 157 Middle Fork Gaging Station Operations and Maintenance 02/01/2018
K 157 Cottonwood Action to Stabilize Temperature (CAST) Monitoring 02/01/2018
L 157 Evaluation of BDAs to improve juvenile steelhead production by maintaining perennial flows to provide a migration corridor and suitable habitat in Bear Creek 09/13/2018
M 158 Mark-Recapture Studies 07/12/2018
N 162 Analysis and Interpretation of Field Data Collected From Fisheries Surveys 02/01/2018
O 175 IDIQ Engineering Support 02/01/2018
P 191 John Day Basin Partnership 02/01/2018
Q 30 Fox Creek Mid Reach 10 Habitat Restoration - Channel Realignment 02/01/2018
R 29 Fox Creek Mid Reach 10 Habitat Restoration - Instream Habitat 02/01/2018
S 47 Fox Creek Mid Reach 10 Habitat Restoration - Riparian Planting 02/01/2018
T 40 Fox Creek Mid Reach 10 Habitat Restoration - Riparian Fence 02/01/2018
U 199 Fox Creek Mid Reach 10 Habitat Restoration - Juniper Removal 02/01/2018
V 34 Fox Creek Mid Reach 10 Habitat Restoration - Off Channel Stock Water 02/01/2018
W 175 Fox Creek Reach 18 Habitat Restoration - Final Design 01/31/2019
X 199 Fox Creek Reach 18 Habitat Restoration - Tree Harvest
Y 199 Fox Creek Reach 18 Habitat Restoration - Juniper Removal 01/31/2019
Z 175 Fox Creek Upper Reach 10 Passage and Habitat Design
AA 175 Fox Creek Reach 9 and Lower Reach 10 Habitat Project Design
AB 175 Rock Creek Diversion Design
AC 175 Upper John Day Habitat
AD 175 Phipps Meadow Restoration Design
AE 29 Wiwaanaytt Meadow Restoration Phase 3 - Habitat Complexity 06/10/2018
AF 30 Wiwaanaytt Meadow Restoration Phase 3 - Channel Realignment 06/10/2018
AG 181 Wiwaanaytt Meadow Restoration Phase 3 - Wetland Enhancement 06/10/2018
AH 85 Wiwaanaytt Meadow Restoration Phase 3 - Barrier Removal 06/10/2018
AI 55 Cottonwood Sediment Control
AJ 175 Deer Creek Passage Design
AK 175 Cottonwood Creek Engle Passage Design
AL 199 Bear Creek Juniper Treatment 07/30/2018
AM 47 Neal Habitat Long Creek 08/24/2018
AN 198 Riparian Plant Maintenance 02/01/2018
AO 114 John Day Basin Conservation Officer 02/01/2018
AP 172 GSG Easement Pre-Acquisition Activities 02/01/2018
AQ 193 GSG Easement Management Plan
AR 199 Lonerock Ridge Juniper Project 11/08/2018
AS 185 Periodic Status Reports for BPA 02/01/2018
AT 132 Submit Progress Report for the period (February 2016) to (January 2018) 02/01/2018
AU 115 CCR-40402 Middle Fork Riparian Vegetation Plan 04/18/2018
AV 175 CCR-40402 Rock Creek Diversion Design
AW 175 CCR-40402 Reynolds Creek Ditch Design
AX 85 CCR-40402 Fox Creek Reach 18 Habitat Restoration - Remove Passage barrier 10/01/2018
AY 34 CCR-40402 Fox Creek Reach 18 Habitat Restoration - Provide Off Channel Stock Water Trough 10/01/2018
AZ 40 CCR-40402 Fox Creek Reach 18 Habitat Restoration - Install Riparian Fence 01/22/2019
BA 40 CCR-40402 Fox Creek Reach 18 Habitat Restoration - Install Aspen Protection Fence 10/01/2018
BB 84 CCR-040402 Fox Creek Reach 18 Habitat Restoration - Pump Station 01/20/2019
BC 203 CCR-040402 Fox Creek Reach 18 Habitat Restoration - Install Pipeline 01/20/2019
BD 47 CR-040402 Middle Fork John Day Plant Propagation 07/16/2018
BE 175 CR-040402 Upper John Day Irrigation IDIQ
BF 175 CCR-040402 Upper John Day Habitat Design
BG 157 CCR-040402 John Day Temperature Monitoring - Expanded Scope 07/16/2018