| Province | Subbasin | % |
|---|---|---|
| Mountain Snake | Salmon | 100.00% |
* Expenditures data includes accruals and are based on data through 30-Nov-2025.
| Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
|---|---|---|---|---|
| Prepare Necessary Environmental Compliance documentation for relevant projects | B: 165. Produce Environmental Compliance Documents for projects | 12/31/2014 | 12/31/2014 | |
| Identify and Select Individual Projects | C: 114. Identify and develop habitat projects | 03/31/2015 | 03/20/2015 | |
| All administrative tasks fulfilled with timely quality products | D: 119. Routine contract actions | 04/30/2015 | 04/30/2015 | |
| Designs and Specifications from NRCS on BPA projects | E: 175. NRCS Technical staff and Challis position | 04/30/2015 | 04/30/2015 | |
| Visitation Log | F: 26. Investigate Trespass on Easement Property | 11/30/2014 | 06/27/2014 | |
| Conduct Education and Outreach Program to target key habitat and passages areas within CSWCD. | G: 99. Provide Outreach and Education for Habitat Projects | 04/24/2015 | 04/16/2015 | |
| BA, 404 Permit and consultation documentation and the removal of the Diversion on Garden Creek | H: 84. Utilize Limited funding from BPA & Complete Consultation Diversion Removal of City Diversi | 03/30/2015 | 11/30/2014 | |
| Install Gravity Pipeline to replace Hydro Power on Pole Creek | I: 149. Install Gravity Pipeline on Pole Creek for Water Conservation | 04/30/2015 | ||
| Install Sprinkler Irrigation on Pole Creek to provide ground water to supplemental surface water | J: 150. Install Irrigation infrastructure on Pole Creek for Water Conservation | 04/30/2015 | 04/30/2015 | |
| Attach Progress Report in Pisces | K: 132. Annual Report for the period January 2013 through December 2013 | 04/25/2014 | 08/20/2014 |
| Primary Focal Species | Work Statement Elements |
|---|---|
| Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened) |
|
| Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU |
|
| Sockeye (O. nerka) - Snake River ESU (Endangered) |
|
| Steelhead (O. mykiss) - Snake River DPS (Threatened) |
|
| Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
|---|---|---|---|---|---|---|---|---|---|
| A | 185 | Periodic Status Reports for BPA | 01/01/2014 | ||||||
| B | 165 | Produce Environmental Compliance Documents for projects | 01/01/2014 | ||||||
| C | 114 | Identify and develop habitat projects | 01/01/2014 | ||||||
| D | 119 | Routine contract actions | 01/01/2014 | ||||||
| E | 175 | NRCS Technical staff and Challis position | 10/25/2013 | ||||||
| F | 26 | Investigate Trespass on Easement Property | 01/01/2014 | ||||||
| G | 99 | Provide Outreach and Education for Habitat Projects | 01/01/2014 | ||||||
| H | 84 | Utilize Limited funding from BPA & Complete Consultation Diversion Removal of City Diversi | 06/23/2014 | ||||||
| I | 149 | Install Gravity Pipeline on Pole Creek for Water Conservation | 04/02/2015 | ||||||
| J | 150 | Install Irrigation infrastructure on Pole Creek for Water Conservation | 04/02/2015 | ||||||
| K | 132 | Annual Report for the period January 2013 through December 2013 | 01/01/2014 | ||||||
| L | 132 | Annual Report for1/1/14 through 12/31/14 will be submitted in 2015 | 01/01/2014 |