Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 63589: 2007-268-00 EXP IDAHO WATERSHED HABITAT RESTORATION
Project Number:
Title:
Idaho Watershed Habitat Restoration-Custer District
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
63589
Contract Title:
2007-268-00 EXP IDAHO WATERSHED HABITAT RESTORATION
Contract Continuation:
Previous: Next:
59926: 2007-268-00 EXP IDAHO WATERSHED HABITAT RESTORATION
  • 68920: 2007-268-00 EXP IDAHO WATERSHED HABITAT RESTORATION
Contract Status:
Closed
Contract Description:
Problems identified in the Salmon Sub-basin Management Plan (May 2004) indicate that the Upper Salmon Watershed encompasses a total of five Chinook species populations, two steelhead populations and one sockeye population. The Upper Main-stem Salmon River from Pahsimeroi confluence to the headwaters has been altered by irrigation with-drawls. The plan addresses improved connectivity of tributaries that are intercepted or impacted by irrigation ditches.  Improvements to water delivery on both Garden Creek and Pole Creek is anticipated to modify the sequence and/or timing of when these diversions operate and how much flow is taken out of these systems at critical times to sustain the focal species. The irrigation diversion components that are addressed within this proposal are in full cooperation and partnership with Idaho Department of Fish and Game Screen Shop, Bureau of Reclamation, NRCS and many other partners including but not limited to OSC and the Upper Salmon Watershed Project.
Account Type(s):
Expense
Contract Start Date:
01/01/2014
Contract End Date:
04/30/2015
Current Contract Value:
$337,935
Expenditures:
$337,935

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Prepare Necessary Environmental Compliance documentation for relevant projects B: 165. Produce Environmental Compliance Documents for projects 12/31/2014 12/31/2014
Identify and Select Individual Projects C: 114. Identify and develop habitat projects 03/31/2015 03/20/2015
All administrative tasks fulfilled with timely quality products D: 119. Routine contract actions 04/30/2015 04/30/2015
Designs and Specifications from NRCS on BPA projects E: 175. NRCS Technical staff and Challis position 04/30/2015 04/30/2015
Visitation Log F: 26. Investigate Trespass on Easement Property 11/30/2014 06/27/2014
Conduct Education and Outreach Program to target key habitat and passages areas within CSWCD. G: 99. Provide Outreach and Education for Habitat Projects 04/24/2015 04/16/2015
BA, 404 Permit and consultation documentation and the removal of the Diversion on Garden Creek H: 84. Utilize Limited funding from BPA & Complete Consultation Diversion Removal of City Diversi 03/30/2015 11/30/2014
Install Gravity Pipeline to replace Hydro Power on Pole Creek I: 149. Install Gravity Pipeline on Pole Creek for Water Conservation 04/30/2015
Install Sprinkler Irrigation on Pole Creek to provide ground water to supplemental surface water J: 150. Install Irrigation infrastructure on Pole Creek for Water Conservation 04/30/2015 04/30/2015
Attach Progress Report in Pisces K: 132. Annual Report for the period January 2013 through December 2013 04/25/2014 08/20/2014

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 26 Investigate Trespass
  • 1 instance of WE 84 Remove/Install Diversion
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 149 Install Pipeline
  • 1 instance of WE 150 Install Sprinkler
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU
  • 1 instance of WE 114 Identify and Select Projects
Sockeye (O. nerka) - Snake River ESU (Endangered)
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 149 Install Pipeline
  • 1 instance of WE 150 Install Sprinkler
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 26 Investigate Trespass
  • 1 instance of WE 84 Remove/Install Diversion
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 149 Install Pipeline
  • 1 instance of WE 150 Install Sprinkler

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 01/01/2014
B 165 Produce Environmental Compliance Documents for projects 01/01/2014
C 114 Identify and develop habitat projects 01/01/2014
D 119 Routine contract actions 01/01/2014
E 175 NRCS Technical staff and Challis position 10/25/2013
F 26 Investigate Trespass on Easement Property 01/01/2014
G 99 Provide Outreach and Education for Habitat Projects 01/01/2014
H 84 Utilize Limited funding from BPA & Complete Consultation Diversion Removal of City Diversi 06/23/2014
I 149 Install Gravity Pipeline on Pole Creek for Water Conservation 04/02/2015
J 150 Install Irrigation infrastructure on Pole Creek for Water Conservation 04/02/2015
K 132 Annual Report for the period January 2013 through December 2013 01/01/2014
L 132 Annual Report for1/1/14 through 12/31/14 will be submitted in 2015 01/01/2014