Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 69333: 2002-059-00 EXP WEST FORK YANKEE FORK PHASE I
Project Number:
Title:
Yankee Fork Salmon River Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
69333
Contract Title:
2002-059-00 EXP WEST FORK YANKEE FORK PHASE I
Contract Continuation:
Previous: Next:
65446: 2002-059-00 EXP YANKEE FORK RESTORATION - PREACHERS COVE
  • 72585: 2002-059-00 EXP WEST FORK YANKEE FORK PHASE II
Contract Status:
Closed
Contract Description:
Create habitat for Chinook and steelhead at the confluence of the Yankee Fork and the West Fork by creating a new Yankee Fork channel in the historic channel location and creating side channels as needed.  Habitat will be created in the newly created channel by adding large wood, boulders, and spawning gravel.  Disturbed areas will be seeded and planted with woody vegetation.
Account Type(s):
Expense
Contract Start Date:
06/01/2015
Contract End Date:
05/31/2016
Current Contract Value:
$241,303
Expenditures:
$241,303

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Chad Colter Shoshone-Bannock Tribes No Interested Party ccolter@sbtribes.com (208) 239-4553
Mark Davidson Trout Unlimited (TU) No Supervisor mdavidson@tu.org (208) 720-2475
Lytle Denny Shoshone-Bannock Tribes No Interested Party ldenny@sbtribes.com (208) 239-4560
Paul Drury US Bureau of Reclamation (BOR) No Interested Party pdrury@usbr.gov (208) 378-5076
Israel Duran Bonneville Power Administration No Env. Compliance Lead induran@bpa.gov (503) 230-3967
Evelyn Galloway Shoshone-Bannock Tribes No Technical Contact egalloway@sbtribes.com (208) 239-4570
Matt Green Trout Unlimited (TU) Yes Contract Manager mgreen@tu.org (208) 251-0197
Jim Gregory Trout Unlimited (TU) Yes Technical Contact gregory_jim@yahoo.com (208) 390-5306
Jennifer Lord Bonneville Power Administration Yes COR jklord@bpa.gov (503) 230-5192
Daniel Stone Shoshone-Bannock Tribes No Interested Party dstone@sbtribes.com (208) 239-4555
Dorothy Welch Bonneville Power Administration Yes F&W Approver dwwelch@bpa.gov (503) 230-5479
Karen Wolfe Bonneville Power Administration Yes Contracting Officer ktwolfe@bpa.gov (503) 230-3448
Caselle Wood Trout Unlimited (TU) Yes Administrative Contact caselle.wood@tu.org (208) 390-2028


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Complete all required EC and obtain site specific permits prior to implementation of project a A: 165. Environmental Compliance 05/31/2016 12/15/2015
All administrative tasks fulfilled with timely quality products B: 119. Manage and Administer Project 05/31/2016 05/31/2016
Construction Management Complete C: 100. Construction management for West Fork Yankee Fork Phase I restoration project 02/29/2016 02/29/2016
As built record drawings submitted to BPA. D: 29. Increase complexity on West Fork Yankee Fork Phase I restoration project 11/30/2015 12/22/2015
As Built Map of Channel E: 30. Construct new channel 12/31/2015 12/22/2015
Create, Restore, and Enhance wetlands F: 181. Create, Restore, and Enhance wetlands 01/31/2016 10/01/2015
As built record drawings submitted. G: 55. Construction Site Best Management Practices 08/15/2015 08/22/2015
As built record drawings submitted to BPA. H: 180. Enhance floodplain, remove road embankment 11/30/2015 12/22/2015
Remove mine tailings I: 52. Remove Mine Tailings 08/31/2015 10/01/2015
Plant vegetation at Preachers Cove habitat restoration project J: 47. Plant vegetation at West Fork Yankee Fork Phase I restoration project 11/30/2015 11/05/2015
Progress Report has been published L: 132. Submit Progress Report for the period June 2015 thru May 2016 05/31/2016 05/12/2016

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 52 Remove Mine Tailings
  • 1 instance of WE 55 Erosion and Sedimentation Control
  • 1 instance of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
  • 1 instance of WE 181 Create, Restore, and/or Enhance Wetland
  • 1 instance of WE 100 Construction Management
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 52 Remove Mine Tailings
  • 1 instance of WE 181 Create, Restore, and/or Enhance Wetland
  • 1 instance of WE 100 Construction Management

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental Compliance 06/01/2015
B 119 Manage and Administer Project 06/01/2015
C 100 Construction management for West Fork Yankee Fork Phase I restoration project 06/01/2015
D 29 Increase complexity on West Fork Yankee Fork Phase I restoration project 07/02/2015
E 30 Construct new channel 07/02/2015
F 181 Create, Restore, and Enhance wetlands 07/02/2015
G 55 Construction Site Best Management Practices 07/02/2015
H 180 Enhance floodplain, remove road embankment 07/02/2015
I 52 Remove Mine Tailings 07/02/2015
J 47 Plant vegetation at West Fork Yankee Fork Phase I restoration project 07/02/2015
K 185 Periodic Status Reports for BPA 06/01/2015
L 132 Submit Progress Report for the period June 2015 thru May 2016 06/01/2015